EPC Substations · Projects from $1,000,000 MXN

MV/HV power substations

Construction, refurbishment and major maintenance with comprehensive EPC engineering: design, equipment supply, installation, acceptance testing and commissioning, from 13.8 kV to 115 kV in Mexico.

Primary VLF & Electrical Tests Industry · Oil&Gas · CFE · Ingenios IEC 62271 / NOM-001-SEDE
Scope of service

Services for electrical substations

We cover the complete life cycle: from conceptual engineering to periodic major maintenance.

EPC Construction

Conceptual and detailed design, supply of transformers, switches, switchgear and bars, civil works, electromechanical assembly, FAT/SAT tests and turnkey commissioning.

Rehabilitation and expansion

Replacement of switches, disconnectors and transformers. Expansion of operational capacity. Modernization of protection and control systems (SEL, Schweitzer, ABB REF numerical relays).

Major maintenance

Preventive and corrective maintenance: primary electrical tests, VLF, thermographic inspection, cleaning and adjustment of switches, calibration of protection relays and coordination of protections.

Electrical acceptance tests

TTR (transformation relation), devanate resistance, dielectric rigidity, vacuum and load losses, VLF to MV and HV cables, short circuit impedance test.

Synchronization switchgear and interlocks

Design and installation of synchronization switchgear for cogeneration systems and generation plants. Safety interlocks, mechanical and electrical interlocks for shared substations.

ALS/SF₆ Switches

Supply, installation and rehabilitation of high voltage switches SF6 (ALS 5315, ALS 56-235) for CFE Transmission and industrial substations. Reload and SF6 tests.

Reference projects

Substations we have built and maintained

Industrial substations, offshore platforms, sugar mills and board rehabilitation for CFE Transmission.

PIASA Group

San Luis Potosí and Veracruz

Construction of electrical substation. Medium voltage electrical engineering for the connection of substation to panels and MCC at the Tres Valles and Adolfo López Mateos sugar mills.

CFE Transmission

Jalisco

Supply and installation of spare parts for the rehabilitation of sections with ALS 5315 and ALS 56-235 metal-clad panel bond switches.

Cement plant

Jalisco

Major maintenance to 69 kV substation.

Three Valleys Mill

Veracruz

Supply and commissioning of materials for the increase in operational capacity of electrical substations Nos. 2 and 5, by 4 160 V, with electrical testing.

MALOOB-D and ZAAP-E platforms — Pemex

Campeche (offshore)

Electrical testing and commissioning of substations made up of metal-clad distribution boards, 1,500 and 1,000 kVA transformers and uninterruptible power systems.

BALAM Platform — Cotemar

Campeche (offshore)

Comprehensive VLF electrical tests to the primary and secondary circuits of the disconnector, and diagnosis of the 1,500 kVA transformer.

Ingenio Adolfo López Mateos

Oaxaca

Engineering, supply and commissioning of the synchronization switchgear of the cogeneration system, with MSCL II and DECS 250 equipment on the control panel.

Campeche Litoral-A — Pemex

Campeche (offshore)

Supply, installation and testing of the main 800 A switch in 4 160 V type metal-clad, Siemens brand, which feeds a transformer in epoxy resin of 1 500 kVA, 4 160/ 480 V.

Bottling plant

Colima

Maintenance of substation, four transformers and low voltage distribution boards, with thermography, megger tests on wiring and operation tests on switches.

Methodology

EPC execution process

Engineering and design

Field survey, short circuit study, coordination of protections, single-line plans, calculation reports and equipment specifications.

Equipment supply

Transformers, SF6 or vacuum switches, MV switchgear, bars, control boards and protection. Follow up on the factory at the factory.

Construction and installation

Civil works (foundations, cubes), electromechanical assembly, control and instrumentation wiring, and ground connections.

Testing and commissioning

SAT tests according to NETA MTS: TTR, resistance, VLF, dielectric strength, relay calibration, functional test and transfer of operation to the client.

Electrical tests

Acceptance and diagnostic tests that we perform

IEEE C57.12/IEC 60076

TTR — Transformation Reason

Check the nominal rotation ratio and the polarity of the devanados in all the OCTC/OLTC taps.

NET MTS/IEC 60076

Winding resistance

Detects loose joints, broken conductor or thermal deterioration in coils. Measurement with Kelvin bridge or micro-ohmmeter.

IEEE 400.2/IEC 60502

VLF — OW Low Frequency

Dielectric test at 0.1 Hz in MV cables. Detects deterioration of XLPE insulation without risk of destruction as in DC.

IEC 60076-1 §11.5

Dielectric strength (hypot)

voltage applied for 1 minute to verify integrity of the main and interphase insulation.

ANSI/NET MTS

Contact resistance

Measurement of resistance in the main circuit of switches and disconnectors to detect burned or loose contacts.

IEC 62271/ANSI C37

Opening/closing time

Verification of SF6 and vacuum circuit breaker operation times with trigger circuit analyzer.

Supplied equipment

Substation components we supply

VMS Energy works with leading manufacturers to supply all components of a complete LV/MV substation: from the repair to the protection instrumentation.

Component Voltage level Available brands SUPPLY Installation
Medium-voltage switchgear MV (4.16–34.5 kV) Schneider, ABB, SIEMENS ✓ ✓
Automatic switches LV and MV Schneider, ABB, SIEMENS, EATON, CHINT ✓ ✓
PCYM bricklayers (Protection, Control and Measurement) MV Schneider, ABB, SIEMENS ✓ ✓
Automatic transfer bottles LV/MV LV and MV Schneider, ABB, SIEMENS, CIME, TRACSA ✓ ✓
Insulation bricks LV Schneider, ABB, SIEMENS ✓ ✓
Medium and high voltage terminals MV and HV HUBBELL, IUSA, 3M, Sigtronic ✓ ✓
Lightning rod MV and HV Hubbell ✓ ✓
Grounding resistance MV Bender ✓ ✓
Medium voltage meters MV Schneider Electric ✓ ✓

✓ = service available, We have other manufacturers as per customer specification.

Regulatory framework

Standards that we apply in substations

IEC 62271

High voltage switchgear. General and particular requirements for MV/HV switches, disconnectors and shielded switchgear.

IEC 60076

Power transformers. Complete series: general requirements, temperature, insulation, short circuit and dry transformers.

NOM-001-HEADQUARTERS

Electrical installations in Mexico. National reference for design, installation and operation of substations and connections.

NET MTS

Maintenance Testing Specifications. Internationally accepted test procedures for acceptance and maintenance of medium and high voltage equipment.

IEEE C57.12

Standard for Transformers. Performance and testing requirements for distribution and power transformers in North America.

CFE L0000-06

CFE specifications. Requirements for supply and installation of equipment in CFE Transmission and Distribution facilities.

Frequently asked questions

Common doubts about electrical substations

What does the major maintenance of a substation include?
Major maintenance covers: primary electrical tests (TTR, winding resistance, dielectric strength), VLF tests of primary and secondary circuits, inspection and diagnosis of switches and disconnectors, adjustment and verification of protection relays, cleaning and painting of the structure, and issuance of a condition report with recommendations.
What are VLF tests in substations?
VLF ( Mania Low Frequency) is a dielectric test technique that applies alternating voltage at very low frequency (0.1 Hz) to MV and devanated cables. Detecta deterioration of the insulation LEDL without the risk of destruction that comes with traditional CD voltage. VMS Energy routinely applies it to primary and secondary circuits of industrial substations and offshore platforms.
Does VMS Energy build substations from scratch?
Yeah. VMS Energy carries out complete EPC projects for electrical substations: conceptual and detail engineering, equipment supply (transformers, SF6 switches, switchgear, bars), civil works, electromechanical assembly, NETA acceptance tests and commissioning. References include the construction of substations for PIASA in Veracruz and the major maintenance of substation of 69 kV in Jalisco.
What levels of stress do you work with?
VMS Energy works with substations from medium voltage (4.16–34.5 kV) to high voltage (115 kV). We have executed projects in 4 160 V, 6.6 kV, 13.8 kV, 23 kV, 34.5 kV and 69 kV for industry, oil & gas and ingenuity, as well as rehabilitation works for ALS switches for CFE Transmission.

Have experts in electrical substations!

From conceptual engineering to commissioning, with support from Oil & Gas, industry and CFE.

Do you need the FQ/DGA analysis of the oil?

VMS Energy performs the complete diagnostic of dielectric oil: BDH stiffness, humidity, acidity, DGA by chromatography and Duval triangle, as per IEC 60422 and IEEE C57.104.

See dielectric oil analysis service →