Industrial Predictive Maintenance
Thermography IR · VLF · Diagnostic Transformers
Infrared thermography, VLF tests on medium voltage cables, complete transformer diagnosis and energy quality analysis. Detected failures before they occur and reduced costs of levant maintenance.
Electrical predictive maintenance services
We use non-invasive diagnostic technology to assess the actual condition of your electrical assets without interrupting production.
NETA MTS / ISO 18434
Infrared termography (IR)
Inspection with thermal imaging camera on electrical panels, substations, motors, transformers and MCC under load. Detects loose connections, damaged fuses, phase imbalance and conductor overload. Report with IR/visible images and priority classification according to delta-T.
IEC 60060-3/IEEE 400.2
VLF test on MV cables
Very low frequency test (0.1 Hz) on 5–35 kV XLPE/EPR cables. Detects water trees, voids and insulation degradation without damage to healthy cable. Includes leakage current monitoring (tan-delta) for quantitative evaluation of insulation status.
IEEE C57.12.91/NETA MTS
Transformer diagnosis
Complete battery of tests: TTR (transformation ratio), winding resistance, insulation resistance and polarization index (PI), power factor of the dielectric and dielectric strength of the oil. Green/yellow/red traffic light evaluation and intervention recommendation.
IEC 61000-4 / IEEE 519
Power quality and harmonics
Measurement of THDi, THDv, power factor, flicker, voltage dips and transients with a power quality analyzer. Identifies sources of distortion, affected equipment and proposes solutions (passive filters, APF, capacitor bank).
IEC 60599/ASTM D3612
DGA analysis of oil (transformers)
Analysis of dissolved gases (H₂, CH₄, C₂H₂, CO, CO₂) in transformer oil to detect partial discharges, internal arcs and overheating of insulating paper. Interpretation according to the Duval and Rogers method for precise diagnosis of the type of internal failure.
NET MTS/IEC 62271
Tests of MV switches and switchgear
Measurement of switch opening and closing time, static contact resistance (microohmmeter), trip coil test, spring mechanism verification and insulation test. Compatible with SF₆, vacuum and air switches.
Condition criteria per test
We evaluate each asset with quantitative criteria based on NETA, IEEE and manufacturer standards. Each report includes a condition rating that makes it easy to prioritize corrective maintenance.
| Test | Parameter | Normal | Review | Urgent action |
|---|---|---|---|---|
| Termography IR | Delta-T vs. environment | 0–10°C | 11–30°C | > 30°C |
| Insulation resistance | Polarization Index (PI) | ≥ 2.0 | 1.0–2.0 | < 1.0 |
| VLF Tan-delta | Loss factor at 0.1 Hz | < 0.5% | 0.5–1.0% | > 1.0% |
| Oil dielectric strength | KV rupture voltage | > 30 kV | 20–30 kV | < 20 kV |
| Contact resistance | Microohms (MV switch) | < 100 µΩ | 100–300 µΩ | > 300 µΩ |
| Harmonic THDv | Total voltage distortion | < 3% | 3–5% | > 5% |
Predictive services performed
BALAM Platform — Cotemar
Campeche (offshore)
Comprehensive VLF electrical tests to the primary and secondary circuits of the disconnector, with installation of premolded elbows and T-body for 35 kV, 200 A, 2/0 gauge.
Maritime Services Campeche / Pemex
Campeche
Commissioning of 1,500 kVA power transformer with complete battery: insulation resistance (Megger), ohmic resistance to windings, power factor, TTR transformation ratio and performance tests.
EK-A platform — Cotemar
Campeche (offshore)
Review, inspection, evaluation and diagnosis of the 7,500 kVA transformer.
MALOOB-D — Ku-Maloob-Zaap Asset, Pemex
Campeche (offshore)
Technical and visual inspection, replacement of components and field testing of the VDF-10-01 variable speed drive, Siemens brand.
Bottling plant
Colima
Maintenance of substation, four transformers and low voltage distribution boards, with thermography, megger tests on wiring and operation tests on switches.
Cement plant
Jalisco
Major maintenance to 69 kV substation.
Predictive diagnosis process
1. Asset collection
Inventory of equipment to be diagnosed: transformers, panels, MV cables and switches. Review of maintenance history, previous failures and operating conditions (load, temperature, age).
2. Inspection and testing
Execution of thermography under load, VLF tests without interrupting operation (MV cables), and battery of acceptance tests on transformers and switches during scheduled shutdown window.
3. Analysis and diagnosis
Interpretation of results according to NETA MTS, IEEE and manufacturer. Classification of each asset in green/yellow/red traffic light with technical reason and comparison against commissioning reference values.
4. Report and action plan
Delivery of technical report with IR images, measurement graphs, condition table and prioritized action plan. The report can be the basis for the corrective maintenance budget for the following period.
Machinery monitoring and protection equipment
VMS Energy supplies, installs and implements continuous monitoring systems Bently Nevada (Baker Hughes), the world reference in protection of critical rotating machinery in O&G, generation and petrochemical plants.
Baker Hughes · Bently Nevada
Protection system 3500Modular continuous monitoring platform for critical turbines, compressors and pumps. Measures radial and axial vibration, rotation speed, temperature and axis position. SIL-1 certificate for automatic emergency stops.
- Configurable channels: displacement, speed, acceleration
- Modbus, Profibus, FOUNDATION Fieldbus communication
- Compatible with existing DCS/SCADA
- Independent triggers and alerts (hardware)
Baker Hughes · Bently Nevada
BV7 Portable Vibration MonitorPortable analyzer for inspection routes and field diagnosis. Captures FFT spectrum, waveform and vibration trends in motors, pumps, fans and reducers. Integrates with Bently Nevada System 1 software.
- Simultaneous acceleration and velocity capture
- FFT analysis in the field without PC
- Export to System 1/CMMS databases
- Ideal for condition-based maintenance programs
- Modernization and installation of vibration analysis systems
- System 3500 configuration and commissioning
- Training operators in spectrum interpretation
- Integration to plant SCADA / DCS
- Fault diagnosis in rotating machinery on site
Why continuous monitoring? Failures in critical rotating machinery (turbines, compressors) have a development time from start to breakdown of 1 to 6 weeks. The 3500 System detects changes in the vibration signature days before failure, allowing a planned shutdown versus a forced shutdown that can cost 10x more.
Questions about electrical predictive maintenance
When is it recommended to test a VLF on medium voltage cables?
VLF (Very Low Frequency, 0.1 Hz) testing is recommended every 3–5 years on MV cables in service, after any cable failure or repair, and as an acceptance test in new installations. It is especially critical in XLPE and EPR cables that accumulate waterlogging over time.
What does infrared trimography detect in electrical installations?
IR thermography detects hot spots due to loose connections, deteriorated fuses, load imbalance, overloading of conductors, incipient failures in transformers and motors, and defective insulation in switchboards and substations. A hot spot of more than 30°C above the environment is a sign of urgent corrective action.
What does the full diagnosis of a power transformer include?
Complete diagnosis includes: TTR (turns ratio), cold winding resistance, insulation resistance (megger at 1 kV or 5 kV) and polarization index (PI), dielectric power factor, oil DGA analysis and dielectric strength test. A report is delivered with a condition light and intervention recommendation.
Can you run VLF tests on offshore platforms?
Yes. We have conducted VLF tests on MV 4 160 V cable systems on Pemex/Cotemar platforms in the Gulf of Mexico, under offshore safety protocols and coordinating stop windows with production equipment.
How often should electrical predictive maintenance be performed?
The NETA MTS recommends annual electrical thermography for critical installations and transformer inspections every 1–3 years. In aggressive environments or installations with high criticality, a semiannual frequency is recommended. MV cables under load must undergo VLF every 3 years.
What is DGA analysis and when is it required?
The DGA analyzes the gases dissolved in the transformer oil (H₂, CH₄, C₂H₂, CO, etc.) to detect partial electric discharges, internal arcs and overheating of insulating paper. It is mandatory in transformers greater than 1 MVA and is recommended annually in critical equipment.
What is the difference between isolation resistance (megger) and polarization index (PI)?
Insulation resistance measures the point condition of the insulation at 1 min. The PI is the ratio RI at 10 min / RI at 1 min. A PI ≥ 2.0 indicates insulation in good condition; between 1.0–2.0 is questionable; less than 1.0 indicates humidity or severe contamination. The PI eliminates the influence of temperature on the reading.
When was the last inspection of your electrical assets?
An unforeseen failure in an MV transformer or cable can cost 10x more than an annual predictive maintenance program. Contact us for a personalized plan.
Request predictive diagnosisEngines, pumps or critical compressors?
Condition monitoring integrates vibration, temperature and current of rotating equipment into your SCADA, with severity alarms and predictive maintenance.
See condition monitoring →Oil transformers on your plant?
Physico-chemical analysis and DGA of dielectric oil is the most effective predictive technique for oil-filled transformers. VMS Energy integrates it into your maintenance program.
See FQ/DGA analysis service →