Lighting design by areas, lighting levels and technology selection for each process.
Engineering and installation of lighting systems for industrial plants in Mexico, emphasizing safety, visual performance and energy efficiency in demanding environments.
Inadequate illuminance levels (lux) in work areas generate risk of accident and fines in STPS inspection. Most plants do not have an updated photometric study or a documented luminaire maintenance program.
300 mercury or sodium luminaires consume 30-40% more energy than their LED equivalent of equal illuminance. The payback for a complete retrofit is usually less than 24 months, but without a detailed consumption study the investment committee does not approve the project.
NOM-031-STPS and NFPA 101 require a minimum autonomy of 90 minutes in an emergency. Many of the systems installed more than 10 years ago have degraded batteries with no recorded maintenance and would not pass an inspection without risk of penalty.
We integrate end-to-end industrial lighting solutions to increase safety, productivity and energy savings.
Lighting design by areas, lighting levels and technology selection for each process.
Integration of luminaires, panels and conduits with safe execution in industrial environments.
Lighting level testing, circuit validation and documented operational delivery.
Photometric diagnosis, detailed engineering and phased execution to improve safety and productivity.
Industrial lighting applications in environments with high operational demands and strict regulations.
Development of the generation control system, with synchronization with CFE and vibration system.
400 kV power cable systems for hydroelectric turbines, with execution in critical environment.
Increase in capacity with operational continuity in the plant.
Includes lighting engineering, technical supply, installation, testing and commissioning on site.
Yes. We plan intervention windows and execution phases to minimize operational continuity impacts.
Yes. We deliver the study with values of lux measured by work area, refractometric plane modeled in DIALux or Relux, and maintenance program according to the standard.
Yes. We supply and install Ex-d and Ex-e-certified IEC 60598 and NEC luminaires for Zones 1, 2 and I and II Divisions in areas with flammable gases, vapours or dusts.
Cree, Philips Lighting, Osram, Holophane and NOM-064-SCFI certified distributors. We select according to the required IP, resistance to mechanical impact IK, working temperature and minimum useful life of 50,000 hours.
Yes. We integrate presence sensors, the Beneficial Power Supply and DALI control or 0-10V to reduce actual consumption by up to 40% additional on the basis of the LED's "Few".
Between 18 and 30 months for medium-sized industrial plants, considering energy savings, reduction in corrective maintenance and useful life greater than 50,000 hours of LED luminaires.
Yes. The scope may include dismantling and layout of mercury luminaries (conform to NOM-052-SEMARNAT), supply, installation, wiring and commissioning of the new system.
Share your requirement in the contact form and we define scope, times and technical proposal.
Filter by category and quickly find the right service for your project.
We did not find services with these filters. Try another category or keyword.
A poorly powered high efficiency luminaire is a flashing luminaire, which lasts half or does not turn on when the warehouse is frozen. Selecting the power and control cable is what separates a 10-year installation from a failure in 3.
LV power cable (220–480 V) for powering lighting boards and industrial luminaire circuits. Gauge sized by connected load and voltage drop limit — critical in large warehouses with long runs.
Low Smoke Zero Halogen Cable for production halls, high-rise warehouses, CEDIS and areas with personnel and merchandise. Flame retardant, low smoke and free of toxic halogen gases — critical for evacuation.
Cable resistant to UV rays, ozone and thermal cycles for lighting patios, parking lots, perimeters and facades. Constructions with HDPE or stabilized PE cover for buried installation and compliance with NOM-001-SEDE.
We size the cable according to the actual load of luminaires and expansion plan, we supply in coordination with the progress of the pipelines and we install together with the luminaires under a single EPC contract. NOM-001-SEDE compliance and traceability per coil.
We review lighting levels, range and times to send you a technical proposal. We will contact you in less than 24 business hours; The proposal time depends on the scope.
VMS Energy has implemented electrical infrastructure projects — including lighting systems, distribution boards and EPC works — in industrial facilities, offshore platforms and process plants throughout Mexico.
Pemex
Campeche (offshore)
Review, inspection, evaluation and diagnosis of a Square D lighting panel.