Biogas and Biomass Engineering
Waste recovery systems, energy modelling and electrical architecture for industrial operation.
We design and integrate biogas, biomass and distributed wind generation for industry in Mexico, focusing on operational continuity and energy efficiency.
Without anemometric measurement of at least 12 months or rigorous characterisation of biogas, generation projections have an uncertainty range of ±20% that makes financing inviable. The investor needs validated P50 and P90, not wind inlets estimates.
Wind and biogas generation require island disconnection protections, reactive power control and participation in frequency regulation in accordance with the Grid Code. A design that does not consider these requirements from the beginning faces observations that delay the interconnection ruling for months or years.
Wind turbines and cogeneration units require preventive maintenance with power curve analysis, gearbox diagnosis and blade monitoring. The shortage of service companies with this capacity in Mexico increases the cost of operation and extends response times in the event of failure.
We implement end-to-end non-solar generation solutions to reduce energy costs and ensure operational performance.
Waste recovery systems, energy modelling and electrical architecture for industrial operation.
Integration of distributed wind generation, power and control systems with coordinated on-site assembly.
Hydraulic control modernization, performance testing, protection verification and documented operational transfer.
From energy evaluation to commissioning, with technical traceability and phased execution for industry and CFE Hydroelectric Plants.
Implementations of non-solar green generation and energy integration for industry and CFE Hydroelectric Plants with efficiency and resilience objectives.
Integration of electrical infrastructure to improve energy efficiency and reliability.
400 kV power cable systems for hydroelectric turbines, with execution in critical environment.
Increase in capacity with operational continuity in the plant.
Includes engineering, technical supply, assembly, testing, interconnection and commissioning of biogas, biomass, distributed wind or microhydro.
Yes. We plan intervention windows and execution phases to minimize operational continuity impacts.
Yes. We execute services of modernization, control, integration and commissioning for CFE Hydroelectric Power Plants under operating continuity schemes.
We model CAPEX, OPEX, resource availability and consumption profile to estimate annual savings, payback and sensitivity scenarios.
Onshore wind, biogas and cogeneration, small hydroelectric plant and low enthalpy geothermal. We evaluate the resource before proposing technology to ensure technical and financial feasibility.
Yes. We prepare the network impact study, the technical documentation required by the CFE Interconnection Resolution and accompany the opinion process until the interconnection contract.
Yes. We design hybrid office architectures with lithium batteries (LFP or NMC) including BMS, PCS and control algorithms to maximize self-sufficiency and meet firm power commitments.
CENACE Network Code, Electrical Sector Law (2025) and provisions of the National Energy Commission, LGEEPA for environmental impact, NOM-001-SEDE for electrical installations, and the corresponding interconnection contract (less than 0.7 MW) or CNE generation permit (0.7 MW or more).
Resource measurement: 12 months. Engineering, permits and interconnection management: 6-12 months. Supply and construction: 8-18 months. Estimated total from greenfield: 26-42 months depending on power and location.
Yes. We perform technical-financial pre-feasibility with LCOE estimation, TIR sensitivity analysis under resource scenarios P50/P90, and regulatory framework review for the most appropriate business model.
Share your requirement in the contact form and we define scope, times and technical proposal.
Filter by category and quickly find the right service for your industrial project or CFE hydroelectric plant.
We did not find services with these filters. Try another category or keyword.
Wind, biogas, biomass, mini-hydro and BESS share a pattern: generation is far from the point of consumption and often crosses open, wet or corrosive terrain. Poorly specified cable in this type of project results in costly field interventions and premature derating. We supply four integrated fronts to the EPC scope.
LV/MV power cable for connection of the generator (wind turbine, biogas engine, biomass turbine, mini-hydro) to the step-up transformer. Flexible constructions for towers with constant vibration; cover resistant to humidity, ozone and UV rays.
DC cable for BESS systems: battery rack to PCS / battery inverter. Adequate insulation for project DC voltage, high continuous current and transient response. Mandatory LSZH constructions in battery room.
MV XLPE cable with steel armor and HDPE cover for buried sections between wind turbines, biogas engines or biomass turbines to the park substation. Resistant to mechanical stress of the terrain and chemically aggressive soils.
HV XLPE cable for section from the project substation to the CFE interconnection point. Specification under LAPEM so that the CENACE/CFE interconnection ruling is not hindered by cable issues. Typically 13.8–115 kV depending on project capacity.
We specify the cable from the generator to the interconnection point under the same technical criteria, we manage LAPEM and interconnection opinion with CENACE/CFE, we coordinate coil logistics for remote sites and we deliver by milestones in the work schedule. A single technical responsibility from the wind turbine/motor/battery to the grid.
We analyze demand, resource availability and return to send you a technical-economic proposal. We will contact you in less than 24 business hours; The proposal time depends on the scope.
The mills generate biomass with bagasse. The technical detail of control, synchronization, protection and interconnection of these plants is in Cogeneration and on-site generation.
Ingenuity Emiliano Zapata
Morelos
Commissioning of a 2301D-ST governor with Valtek 50 actuator in turbogenerator 1, and subsequent modernization of the speed control with Woodward 505 electronic governor.
Ayala Plan Ingenuity
San Luis Potosi
Commissioning of a 2301D-ST governor with CPC-1 actuator in turbogenerator 3.
Ingenio Adolfo López Mateos
Oaxaca
Exchange of the 2301D-ST for a Woodward 505 Enhanced governor in turbogenerator 1; installation of 2301D-ST with control board and Valtek 25 actuator on blade set 1 and 2 steam turbines; and start-up of the synchronization switchgear of the cogeneration system.
Santa Clara Sugar Mill
Michoacan
Supply, installation and commissioning of a Governor Woodward 505 at the NEB TG1 Turbogenerator, with adaptation of a new UG40 actuator; and subsequent modernization of turbine speed control and generation plant.
Dragon Group — Geothermal plant
Nayarit
Development of the new generation control system, with synchronization with CFE, import and export and vibration system: engineering, supply, installation and commissioning with 505, DSLC, MSCL and PROTECH equipment from Woodward, PLC S7 and HMI from Siemens, 3500 from Bently Nevada and DECS 250 from Basler Electric. Then, training in DSCL/MSCL-II and EGCP-3.
Santa Ana Sugar Mill
Escuintla, Guatemala
Engineering, installation and commissioning of Woodward DSCL II and MSCL equipment for the synchronization of four turbogenerators, and a vibration monitoring system.
IEnova
Mexico City
Supply of control equipment — PLC and boards — and hydraulic elements — valves, pumps and accumulators — for the major mantle of a wind field.