Specialized PV line

PV1-F photovoltaic cable for solar parks and industrial roofs

Solutions for solar parks and generation plants with focus on electrical safety and continuity of the project.

Integrated EPC

When VMS supplies the cable, you already know how it will be installed — because we are the ones who will install it.

Through VMShop you can request a cable quote directly — with or without an EPC project. If the supply is part of an EPC project that VMS engineers and builds, the cable is integrated into the MTO with milestone logistics and single responsibility. If you only need the material, we also support you with the same technical rigor.

  • Engineering: We specify the correct cable based on load, route, environment and regulations — not the cheapest cable in the catalog.
  • Coordinated MTO: The cable BOM is synchronized with the construction schedule, not the supplier's inventory.
  • Logistics by milestones: We deliver cable when the job needs it, in the correct quantity and with complete traceability per reel.
  • Sole responsibility: A single company responds by specification, supply, installation, testing and Aing.

If you only need uninstalled supplies, we can also support you — with the same technical and logistical rigors we apply to our EPC projects.

Target applications

  • DC and AC interconnection in photovoltaic parks
  • Utility scale solar plant expansions
  • Medium voltage infrastructure in generation

Value for your project

  • Technical specification according to site conditions
  • Compliance with project requirements and QA/QC
  • Stage-coordinated supply logistics
Engineering Notes

Key criteria for PV selection

All measurements are reference for preliminary selection. Final choice depends on length of stretch, design current, installation method and project voltage drop limits.

Allowable current

Check base ampacity at 20 C and adjust by room temperature, grouping and watering.

Voltage drop

Validate the percentage allowed in DC and AC per tranche, considering total length and caliber.

Protection & security

Coordinate fuses, sectioning and grounding according to topology and inverters.

Temperature and derating

In rooftop or open field installations, the actual cable temperature may exceed 60°C. Apply ampacity correction factors for actual ambient site temperature to avoid premature insulation degradation.

Standard and certification

The PV1-F KEI cable complies with BS EN 50618, 2Pfg 1169/08.2007 and IEC 60228 Class 5. For projects with CFE (interconnection), verify that the park specification includes the standard required by the interconnection opinion.

DC resistance @20 C Correction factors Circuit verification BS EN 50618 TÜV Rheinland CFE Interconnection

Terms like Class 5, Ampacity, BS EN 50618 o LSZH? Consult them in the Cable technical glossary

Frequently asked questions — Photovoltaic cables

What cable section should I use in my solar park?

Depends on the length of the string, the short circuit current of the module (Isc) and the voltage drop limits of the project. For standard strings: 4–6 mm². For long strings or high current: 10–16 mm². For DC trunks: 25–50 mm². VMS does the sizing if you share the electrical design.

Does the PV1-F cable serve as a buried installation?

The standard PV1-F is not designed for direct buried installation. For underground sections in a solar park, cable with additional sheath (double insulation or protective pipe) is required. VMS can specify the correct solution for each leg.

How long are these cables?

The PV1-F KEI cable has an estimated useful life of 30 years under standard operating conditions, with resistance to UV rays, ozone and thermal cycling. It is compatible with the typical useful life of an industrial solar park.

Can you supply the cable together with the EPC solar?

Yes. VMS Energy runs turnkey EPC projects. The supply of photovoltaic cable is part of the EPC range: we specify it, we try and install it. You don't need to coordinate with a separate provider.

Do you handle AC (AC) cable for the investor's exit?

Yes. In addition to the photovoltaic DC cable, we supply MV power cable for the interconnection of the inverter/lift transformer with the interconnection substation. All the cable infrastructure of the park can be managed with VMS.

What standard does CFE require for interconnection of solar parks?

CFE reviews the electrical design through the interconnection opinion (CENACE/CFE). Cables on the AC side must meet LAPEM specifications for interconnection voltage level. VMS accompanies the process from basic engineering to approval of the opinion.

Certified photovoltaic cable for your solar park

Supply of FV cable with UV certification, intemperie resistance and IEC 62930 traceability.