Testing, commissioning and commissioning: no equipment is energized without being tested
We plan, execute and document preoperative electrical tests, controlled energization and performance tests of transformers, panels and switchgear, MCC, medium voltage cables, protections, drives and generation systems. You receive the operating equipment and the dossier that proves it.
The most expensive time to discover a fault is the first power-up
At the end of a work the pressure is to start. It is fair when tests are skipped, “factory” settings are accepted and it is delivered without evidence. These are the situations we see the most:
Undetected shipping or assembly damage
A team that passed the test at the factory can arrive with moisture, a blow or a phoja connection. Without proof in place, the damage appears when energizing.
Protections with generic settings
Relays and switches that come out with factory values and not with those of the coordination study: false trips or, worse, protections that do not trip.
Several suppliers, no one integrates
The board from one, the transformer from another and the drive from a third. Everyone tests their equipment; no one tests the entire system working together.
Delivery without evidence
Without signed protocols or reference values, the warranty is complicated and the maintenance area starts without a baseline against which to compare.
A sequence with two release points
Commissioning is not a test at the end: it is a sequence that begins before the equipment arrives on site. Nothing is energized without the release of preoperative testing, and nothing is delivered without accepted performance testing.
Commissioning plan and protocols
We define what is tested, with what method, with what acceptance criteria and who testifies. It is remembered before the work, not during the start.
Test testing of tests, FAT
We attend factory acceptance tests of transformers, CCMs, disconnectors and drives to confirm that the equipment meets the data sheet before shipping.
Reception and inspection on site
Transport verification, data plate, visible damage and assembly and interconnection conditions before any electrical test.
Preoperative electrical testing (SAT)
With the equipment de-energized: insulation, transformation ratio, resistances, verification of control wiring, adjustments and tripping of protections, interlocks.
Release to energizeControlled energization and commissioning
Energization in stages with programmed maneuvers, voltage verification, phase sequence and no-load behavior; configuration and startup of drives, generation and control.
Function and performance tests
Operation with real load: transfers, synchronization, control and communication loops with SCADA or DCS, and closing of pending (punch list) with the client.
Customer acceptanceThe seventh stage, delivery to operation, is detailed in Deliverables. For the technical details of each test on transformers, consult our guides. FAT and SAT tests and Installation and commissioning of transformers.
From transformer to control loop
We test the equipment and, above all, the system: how the transformer operates with its board, its protections, its backup and its control.
| Equipment or system | Typical tests and verifications |
|---|---|
| Power and distribution transformers | Insulation resistance and polarization index, ohmic resistance of windings, transformation ratio (TTR), power factor, running and performance tests. Analysis of Dielectric oil when applying.Reference: IEC 60076, IEEE C57.12.91 |
| Medium voltage cables and accessories | Insulation resistance, VLF tests on primary and secondary circuits, hypot on terminals and relief cones, verification of splices and premolded elbows.Reference: IEEE 400.2 |
| Blocks, switchgear and sectioners MV/bet, MCC | Pre-operational testing of bars and switches, operation of switches, interlocks and control wiring, automatic transfers, Profibus or Modbus communication. See Medium Voltage switchgear and MCC.Reference: IEC 61439, IEC 62271-200 |
| Electrical protections | Verification of adjustments against coordination study of protections and fire tests of relays and switches. |
| MV and LV frequency changers | Installation, interconnection, configuration, functional tests, commissioning and performance tests with the motor and the process. See frequency changers. |
| Generation, synchronization and governors | Commissioning of speed governors, synchronizers and load control, synchronization with the CFE network, import and export. See Turbogenerators. |
| UPS, batteries and backup | Pre-operational testing, commissioning and performance testing of UPS, chargers and battery banks, including transfer of critical loads. |
| Control, automation and communications | Interconnection and pre-operational testing of PLC, DCS and SCADA; verification of process and communication signals (Profibus, Profinet, Modbus). |
| Grounding systems | Measurement of resistance of the ground network and continuity of equipment connections. |
The standards cited are for reference; The protocol for each project is defined with the client, the project specification, the current NOM-001-SEDE and the recommendations of each manufacturer.
A team operating and evidence that was tested
The commissioning dossier is the baseline for your maintenance: the values against which each future test will be compared.
- Plan and protocolsScope, method and acceptance criteria of each test, agreed before starting.
- Test recordsMeasured values, test conditions and result of each team, signed by the witness.
- Applied settingsFinal adjustments of protections, drives and control, as left on site.
- To-do listPunch list with those responsible and documented closure of each observation.
- Delivery dossierIntegrated commissioning file for operation, maintenance and guarantees.
- Transfer to staffExplanation of the operation and maintenance of your equipment. See Training.
Commissioning on marine platforms, generation and industry
An important part of our projects includes pre-operational testing, commissioning and performance testing, from platforms in Campeche Probe to ingenuity and mines. Examples include:
Pemex · Maloob A Platform
Campeche probe
Pre-operational electrical testing, commissioning and performance testing of Metal Enclosed distribution boards and motor control center.
Pemex · EK-A Platform
Campeche probe
FAT tests, installation, function tests, commissioning and performance tests of 7.5 MVA transformer and 34.5 kV nine-way disconnector.
Pemex · Balam-A Platform
Campeche probe
Primary electrical tests on 12 transformers (6 phase shifters and 6 boosters) and 34.5 kV distribution transformers.
CFE Central Chankanaab
Cozumel, Quintana Roo
Engineering, supply, installation and commissioning of AC and DC motor control centers.
SLB
Tabasco
Engineering, supply, installation and commissioning of two 1000 HP medium voltage drives and 4.16 kV distribution boards.
Baker Hughes
Campeche
Supply, installation and commissioning of 14 cabinet frequency variable frequency drives for intemperie.
Ingenio San Nicolás
Veracruz
Commissioning of the distribution board of the new power plant, with synchronization with CFE, import and export.
Infrastructure · Road tunnel
State of Mexico · 2025
Integration and commissioning of 12 cabinets with frequency converters and Profinet control via SCADA for ventilation and extraction.
Within our EPC or as a commissioner of your project
Commissioning can be a stage of our project or a stand-alone service for equipment you have already purchased or installed by another contractor.
As part of an EPC project
When VMS designs, supplies and installs, commissioning is planned from engineering and closes with a single person responsible for the entire system.
For third-party teams or contractors
We test and commission equipment that others supplied or installed, of any brand, and integrate those from various suppliers into a single working system.
After a retrofit, expansion or failure
Testing and re-energization after a Retrofit, an increase in capacity or a repair, to return to operation with evidence and not by trial and error.
Operations where a failed start is costly
Where the start-up window is short and a delay or failure in first energization is measured in lost production.
Oil & Gas
Offshore platforms and land-based facilities, with short work windows and complex logistics. See solutions oil & gas.
Generation and cogeneration
Mills, paper mills and power plants with turbogenerators, synchronization with CFE and generation control.
Mining, manufacturing and infrastructure
Substations, MCC, pumping with variable frequency drives and ventilation systems where every day of delay in starting stops production. Mining.
Frequently asked questions
What difference is there between testing, commissioning and commissioning?
Can you commission equipment that you didn't supply or install?
Do you test factory tests for the FAT test?
What if a test does not meet the acceptance criteria?
What do they deliver after the commission is over?
Do they work on offshore platforms and outside Jalisco and Campeche?
Do you have a boot at the door?
Tell us what equipment you are going to commission and what stage your project is at. We propose the testing and commissioning plan with scope, times and deliverables.