Infrastructure Engineering
Substations, power supply and electrical architecture for expansion and modernization of assets.
Engineering, technical supply and construction of substations, HV/MV/LV switchboards and industrial networks for power generation, transmission and distribution in Mexico, focusing on reliability and compliance.
A failure in a medium voltage bar without automatic backrest can stop the entire plant. Most of the protection systems in the city have no coordinated selectivity updated; shooting a protective zone affects circuits that should be kept energized.
Harmonics, flickers and voltage drops generated by non-linear loads damage drives, PLCs and precision equipment. Without real-time power quality measurement, problems are diagnosed post-failure when the equipment already has accumulated damage.
The substations designed for the original load do not foresee line expansion or integration of distributed generation. The upgrade requires coordinated reengineering without downtime — a combination that most local contractors cannot guarantee.
We integrate end-to-end energy infrastructure solutions to ensure capacity, continuity and operational performance.
Substations, power supply and electrical architecture for expansion and modernization of assets.
Electromechanical assembly, laying and testing of power systems with coordination by work fronts.
Electrical tests, protection validation and documented operational delivery.
EPC planning for energy assets with risk control, traceability and orderly commissioning.
Energy infrastructure projects with comprehensive scope in high demand and criticality environments.
Integration of electrical infrastructure to improve operational capacity and reliability.
400 kV power cable systems for hydroelectric turbines.
Increase in capacity with operational continuity in the plant.
Includes engineering, technical supply, assembly, testing, commissioning and delivery documentation.
Yes. We plan intervention windows and execution phases to minimize operational continuity impacts.
Yes. We conduct load flow, short circuit and protection coordination studies in ETAP or SKM, with delivery of time-current curves, relief adjustment and executive report.
Yes. We perform the SF6 or vacuum circuit breakers, updating the relays to numerical protection and transformer replacement, preserving existing civil structure and infrastructure.
Yes. We design the common docking point (PCC), island disconnection protections, automatic transfer scheme and integrated dispatch control to the SCADA plant.
Detailed engineering with As-built plans, supply of CFE/NOM certified equipment, civil works, installation, documented FAT/SAT tests and training of operational personnel.
Yes. We have certified personnel in live online jobs under NOM-029-STPS, with approved equipment and validated LOTO protocols to minimize the required cut-off time.
Detailed engineering: 8-12 weeks. Supply of transformer and MV switchgear: 14-20 weeks. Installation and commissioning: 4-8 weeks. The final program depends on the specific scope.
Share your requirement in the contact form and we define scope, times and technical proposal.
Filter by category and quickly find the right service for your project.
We did not find services with these filters. Try another category or keyword.
In transmission and distribution projects, cable is not a commodity: it is the backbone of the infrastructure. Incorrect specification, poor splicing or out-of-window delivery — any of the three can drag down the energization date. We supply the three KEI / Südkabel families for transmission, distribution and interconnection, integrated into the EPC scope.
XLPE cable for transformation substations and transmission lines. Typical voltages 38/66 kV, 64/110 kV, 76/132 kV. Constructions with aluminum metal cover (corrugated or smooth) or lead according to project criteria. IEC 60840 standard.
EHV cable for critical interconnections and primary transmission lines. KEI for most projects; Südkabel when the project requires German manufacturing or VDE standard. IEC 62067 standard. Manufacturing time 16–28 weeks — must be integrated into the EPC schedule.
MV XLPE power cable for main feeders, industrial distribution networks and reinforcement of existing substations. Constructions with steel reinforcement for buried sections and HDPE cover for chemically aggressive soils. IEC 60502 standard.
Major maintenance to the 69 kV substation of a cement plant in the central-west.
| Level | Typical range | Standard |
|---|---|---|
| MV | 1–36 kV | IEC 60502 |
| HV | 36–132 kV | IEC 60840 |
| EHV | 132–400 kV | IEC 62067 |
For projects with interconnection to CFE, additionally review specifications LAPEM current for the level of voltage of the project.
Specification under applicable standard, management with CFE/LAPEM, logistics of large format coils, coordination of premolded splices and terminations, and integration of supply to the EPC schedule with traceable documentation per coil.
We land technical scope, execution sequence and timings to issue a clear route. We will contact you in less than 24 business hours; The proposal time depends on the scope.
CH Angostura and CH Manuel Moreno Torres — CFE
Chiapas
400 kV power cable systems for hydroelectric turbines: two turbines in the first stage and four in the next.
Maritime Services Campeche / Pemex
Campeche (offshore)
Manufacture, supply, pre-operative electrical testing and commissioning of an automatic transfer panel with nine 2 000 A UL switches, coupled to an existing system on the Nohoch-A2 platform.
IEnova—Sempra
Mexico City
Supply of control equipment — PLC and boards — and hydraulic elements — valves, pumps and accumulators — for the major mantle of a wind field.
CFE—Central Chankanaab
Cozumel, Quintana Roo
Engineering, supply, installation and commissioning of motor control centers in alternating current and direct current.
Holcim Mexico
Mexico
VMS Energy client in the cement sector.
Manzanillo Maritime Terminal
Colima
VMS Energy client in the port sector.