Retrofit and modernization of electrical substations
We replace obsolete equipment, modernize LV/MV boards and repair industrial electronic equipment — without having to replace the entire installation. Reduce operational risk and extend the life of your electrical infrastructure.
When does it make sense to modernize rather than replace?
Switches, MV switchgear and boards age. The retrofit replaces only components that fail or become obsolete, maintaining the existing structure and wiring.
Frequency variants, analog AVRs and unsupported mechanical governors pose a risk of prolonged unemployment. Modernisation with digital equivalent eliminates this risk.
Retrofit is typically 30–60% cheaper than new construction. It allows the investment to be distributed in phases with minimal impact on the operation.
When the channeling, ducts, transformer bank and grounding are in good condition, the switchgear and control retrofit is the optimal engineering decision.
Electrical modernization services
Retrofit of LV/MV substations
Replacement of MV switchgear, switches and obsolete equipment with current Schneider, ABB or SIEMens equipment. Includes short circuit studies to validate the breaking capacity of new equipment with current network conditions.
Modernization of LV/MV electrical panels
Repair and modernization of distribution boards, CCMs and control boards. Updating electromechanical relays to multipurpose digital protections with Modbus/IEC 61850 communication.
VFD diagnosis and repair
Failure analysis, repair of electronic cards and reprogramming of frequency converters of all brands (Schneider, ABB, SIEMENS, WEG, TRIOL). Complete functional test before returning to the line.
Retrofit of speed governors
Replacement of mechanical governors (TG-13, TG-17, UG-8, UG-40) with Woodward EG or 2301E electronic units. We preserve the hydraulic actuator and control link when they are in good condition, reducing downtime.
Voltage Regulator Modernization (AVR)
Replacement of obsolete analog AVRs with digital Basler Electric DECS-200/250 or Woodward units. Start-up, V/f curve adjustment and stability test included. Application in synconic generators of any capacity.
Repair of industrial electronic cards
Diagnosis and repair of control, power and communication cards of industrial equipment: drives, UPS, static exciters, control panels and PLCs. Service with a 6-month warranty on replaced spare parts.
Retrofit process in 4 stages
1. Survey and diagnosis
Physical inspection of the substation or equipment, review of plans, reading of electrical parameters and evaluation of the state of the switchgear, control wiring and protection system. We provide a condition report with emergency traffic light before quoting.
2. Modernization engineering
Definition of the replacement scope, selection of equivalent or superior equipment compatible with the existing installation, calculation of short circuit and coordination of protections, and planning of the minimum necessary shutdown window.
3. Replacement and modernization
Execution of the work within the scheduled shutdown window with a certified crew. Installation of new equipment, adaptation of control wiring, updating of protections and parameterization of digital relays.
4. Testing and commissioning
Functional tests of switches, current injection protection tests, supervised energization and delivery of commissioning report. Functional guarantee and post-delivery technical support included.
Compatible replacement devices
Schneider · ABB · SIEMENS · EATON · CHINT
Basler Electric DECS · Woodward
Woodward EG · 2301E · MicroNet · DEIF AGC-4
TRIOL · Schneider · ABB · WEG · SIEMens
Schneider · SEL · GE · ABB
Electrical modernizations carried out
Upgrades electrical systems in operation for CFE, Pemex, sugar mills and airports — without stopping production.
CFE
Jalisco
Supply, installation, testing and commissioning of a Schneider Electric HVX switch for metal-clad panel section.
CFE Transmission
Jalisco
Supply and installation of spare parts for the rehabilitation of the section with ALS 5315 metal-clad panel link switch.
CFE Central Cecilio del Valle
Chiapas (hydroelectric)
Modernization of the Woodward speed control and the plant's hydraulic system.
CFE Central Tamazulapan
Oaxaca (hydroelectric)
Modernization of the Woodward speed control and the plant's hydraulic system.
CFE Merida II
Yucatan
Update of the plant's condensate pump system.
Dragon Group — geothermal plant
Nayarit
Development of the new generation control system, with synchronization with CFE and import and export: Woodward 505, DSLC and MSCL governors, Bently Nevada 3500 vibration system and Basler DECS 250 excitation.
Santa Clara Sugar Mill
Michoacan
Turbine and generation plant speed control modernization: supply, installation and commissioning of a Woodward 505 governor with a new UG40 actuator.
Pemex
Comprehensive rehabilitation contract
Comprehensive rehabilitation contract for power and distribution transformers.
Airports and Auxiliary Services
Mexico
Modernization of the electrical transfer system of the emergency plant.
Frequently asked questions
When is it better to modernize a substation rather than replace it?
When cableways, conduits, the transformer bank and grounding system are in good condition. Retrofitting replaces only failed or obsolete switchgear and controls while preserving the existing structure and wiring.
How much does a retrofit cost compared with a new substation?
Typically 30 to 60 % less expensive than new construction, and it allows investment to be spread across phases with minimal disruption to operations.
Which equipment can be modernized?
MV switchgear, circuit breakers and switching equipment; LV/MV panels and MCCs; upgrades from electromechanical relays to digital protection with Modbus or IEC 61850; variable frequency drives; mechanical speed governors and analog automatic voltage regulators (AVRs).
How long must operations be shut down?
The shortest necessary shutdown window is planned during engineering, and the work is carried out within that scheduled window. For governors, the hydraulic actuator is retained when it is in good condition to reduce downtime.
What is the process?
In four stages: site survey and diagnosis (including a condition assessment before quoting), modernization engineering with a short-circuit study and protection coordination, on-site replacement, and testing and commissioning with a commissioning report.
Do you have obsolete equipment without support or aging substations?
We start with a no-obligation diagnosis. We tell you what to modernize, in what order and how much it costs — before any investment.