Electrical Availability Architecture
A plant does not lose power because it lacks equipment, but because each piece was purchased separately. We integrate grid power, on-site generation, UPS, BESS, solar and controls into a single industrial microgrid.
Six layers, one operation logic
Each layer solves a different problem. The grid supplies, on-site generation provides autonomy, the UPS covers the first milliseconds, the BESS covers minutes or hours and reduces the bill, solar lowers the cost of energy and the EMS/PMS decides what goes in, what goes out and in what order.
When the layers are controlled together, the plant operates as a microgrid
An industrial microgrid is this same system with an additional condition: it can be separated from the network in a controlled way and continue to operate with its own sources. Three elements define it: local generation and storage, a common control (EMS/PMS) and an interconnection point that opens and closes with sync and protections designed for both states.
Mode 1
Connected to the network
Operates in parallel with CFE. The BESS cuts demand peaks, the solar reduces grid consumption and the EMS limits injection when the interconnection does not support export. The generator remains in reserve.
Mode 2
On island
In the event of a failure, or on a scheduled basis during service maintenance, the microgrid is separated from the network. The BESS or the generator forms the internal network, the EMS de-ballasts by priority and the return is synchronized, without a second stoppage.
Mode 3
Isolated, without network
In mines, camps, pumping or platforms where the grid does not reach or is unstable, the microgrid is the complete electrical system: thermal, solar and BESS generation coordinated to reduce fuel. Microgrids for remote sites
No technology covers everything. That's why they are combined.
The right question is not “UPS, BESS or generator?”, but what load needs which layer. This table summarizes the role of each and where we go deeper on the site.
| Cloak | What it solves | Typical response | Limit | Detail |
|---|---|---|---|---|
| Network and substation | Main supply, quality and protection of the facility | — | Micro outages, voltage dips and interruptions beyond your control | MV/HV substations |
| On-site generation | Long autonomy; in cogeneration, in addition, energy and process heat | Seconds (startup, stabilization and transfer) | Does not cover the first few seconds; requires fuel, testing and maintenance | Emergency plants · Cogeneration |
| UPS | Uninterrupted continuity for control, instrumentation and safety systems | No perceptible transfer (double conversion) | Limited autonomy; does not reduce the bill | UPS and BESS |
| BESS | Minutes to hours backup, peak shaving and consumption shifting | Milliseconds to seconds, depending on equipment and configuration | Finite energy; Its economic value depends on the load profile and the rate | UPS and BESS |
| Solar photovoltaic | Lower cost energy during the day | It is not an endorsement by itself | Intermittent; no storage shuts down when network fails | Industrial solar |
| Control / EMS / PMS | Coordinates sources, transfers, load distribution and ballast shedding | Continuous | It's only as good as the engineering of its logics and tests. | See section EMS/PMS |
The sequence we designed and tested
A well integrated architecture responds in a predictable order. The times indicated are typical ranges; the real values are fixed in engineering and verified in the acceptance tests on site.
- t = 0
Network fails
The relays detect loss of voltage or frequency out of range and the installation is separated from the network so as not to feed the fault.
- 0ms
The UPS supports the critical
Control, instrumentation, emergency stop systems and IT remain powered without interruption from the UPS battery bank.
- more to s
The BESS takes essential loads
If the system is configured to operate on the island, the BESS forms the internal network and feeds essential loads while starting the generation.
- - 10–30 s
Generator starts and transfers
The group starts, stabilizes voltage and frequency and the transfer connects it. With multiple groups, the controller synchronizes them and distributes the load.
- Continuous
EMS/PMS de-ballasts and manages
If the available capacity is not sufficient, the system disconnects non-essential loads by priority and reconnects them when there is room.
- return
Orderly return to the network
When the network normalizes, the transfer returns the load (open, closed or soft, depending on design), the generator cools down and the BESS recharges.
Sorting loads defines the size of everything else
Supporting the entire plant with the same technology makes the project more expensive. Classifying loads by the interruption they tolerate allows you to size each layer to what you really need.
| Class | Tolera | Typical examples | Layer that protects it |
|---|---|---|---|
| Criticism | No interruption | PLC, DCS, instrumentation, emergency stop systems, gas and fire, IT and communications | UPS, with generator or BESS backup for autonomy |
| Essential | Seconds | Process pumps, cooling, instrument air, emergency lighting, safety loads | BESS and/or on-site generation with automatic transfer |
| Not essential | Minutes or hours | Office air conditioning, general services, loads that can be rescheduled | Automatic priority shedding from EMS/PMS |
Life safety loads (for example, fire protection systems or evacuation lighting) have their own regulatory requirements: they are defined with the current NOM-001-SEDE and the standards applicable to the site, not only with cost criteria.
The layer that converts loose equipment into a system
An energy management system (EMS) or power management system (PMS) decides in real time which source feeds what charge. We specify, program and integrate it with platforms from DEIF, Woodward and Schneider Electric, depending on the scale and existing infrastructure of the site.
Startup, synchronization and load distribution
Automatic start and stop of groups, synchronization between machines and with the network, active and reactive load distribution and N+1 redundancy.
Load shedding
Priority disconnection due to lack of capacity, low frequency or loss of a source, with staggered reconnection to avoid causing a second trip.
Demand management
Peak shaving with BESS, off-peak consumption shifting and zero injection control when the interconnection does not support export.
SCADA integration
Communication with the plant SCADA or DCS through industrial protocols (Modbus, Profibus, industrial Ethernet), alarms and event recording for subsequent analysis.
Applicable experience: engineering of the load segregation system of the Akal-J process center (Diavaz), synchronization of five Wärtsilä 3,000 kW motor generators at the P.S.S. Chemul and automatic transfer boards integrated to SCADA on the Nohoch-A2 platform.
Modular BESS on an industrial scale
Our reference storage platform is Sigenergy SigenStack; As a multi-brand integrator, the final selection is made after diagnosis. A common question is whether a modular system has industrial capacity. The answer lies in how it scales and how it protects itself.
12 kWh
per stackable module; capacity is aligned to the project rather than buying complete containers
UL 9540A · IEC 62619
thermal propagation and safety tests for industrial batteries documented with Intertek
20 MWh
commercial and industrial project in Bulgaria with 90 investors of 110 kW, installed in 10 days
Per module
security management at the level of the pack, designed to confine an event to the failure unit
What VMS Energy adds: the Balance of System that a manufacturer does not deliver — medium voltage transformation and panels, coordinated protections, grounding, civil works, integration with existing generation and commissioning with signed protocols. Manufacturer data source: Sigenergy, June 2025.
What the bill changes and what the law requires
GDMTH invoice
In the GDMTH tariff (medium voltage, 100 kW or more) demand charges—capacity and distribution—represent an important part of the bill, and the price of peak energy can be several times that of the base hour. In September 2026, the distribution charge varies considerably between CFE divisions.
A well-Shaped BESS attacks both components. With favorable profiles, the return is typically located below four years. We confirm it with the receipt and load curve measured from each plant, never with an average.
Current framework (Electrical Sector Law, 2025)
- The National Energy Commission (CNE) replaced the CRE as regulator.
- Generation less than 0.7 MW: distributed generation, with interconnection contract and without permission from the CNE.
- Self-consumption of 0.7 MW or more: generation permit required; between 0.7 and 20 MW a simplified procedure applies.
- Storage of 0.7 MW or more not associated with a power plant or load center requires a storage permit.
- Isolated self-consumption (microgrid without connection to the grid) of 0.7 MW or more: requires generation permit, without interconnection studies or market registration (DACG of self-consumption, 2025).
- Machinery for renewable generation or efficient cogeneration can be deducted 100% (art. 34, fr. XIII, LISR), with conditions. Validate your case with your tax advisor.
From diagnosis to actual failure testing
1. Survey and measurement
Demand curve in 15-minute intervals, interruption history, load inventory and status of protections, panels and grounding.
2. Architecture and dimensioning
Load classification, layer selection, single-wire, short circuit and coordination studies, and EMS/PMS control philosophy.
3. Supply and installation
Multi-brand procurement, electrical and civil works, assembly and integration with existing infrastructure in planned shutdown windows.
4. Acceptance tests
Simulation of network failure, transfer times, de-linking, network return and alarms, with protocols signed by the client.
Frequently asked questions
What is an industrial micro-grid and how is it different from a traditional back?
Can I turn my current installation into a microgrid?
The BESS replaces the generator?
If I already have an U.S.P., do I need a
My solar panels back me up in a blackout?
What brands are they?
Do I need permission to install a BESS?
Does a microgrid need permission from the CNE?
How much does an hour of unemployment cost you?
We measure your installation, classify your loads and propose the combination of layers that covers the risk with the lowest investment.