Power Factor Correction
Eliminate CFE penalties and reduce your bill
Banks of fixed, automatic, detuned capacitors and active harmonic filters. Study, supply and installation in Mexico. Regulations applied according to the project requirements.
Risk: active CFE penalty
HM, HS and H-SL rates include additional charge if cosφ < 0.90
The low power factor charge can represent up to 30% extra With a bank in the correctly-defined country of the country, the penalty disappears in the first month of operation.
Power factor correction solutions
The correct solution depends on the load profile, the presence of harmonics, the voltage level and the target cosφ.
Fixed capacitor bank
One or more stages of the bus permanently connected to the bus. Ideal for constant reactive loads (always on motors, furnaces, high power transformers). Easy installation and low maintenance cost.
APFC Automatic Bank
Controller measures PF in real time and switches steps of capacitors (thyristors or contactors) to maintain target cosφ. Supports variable loads (production lines, machinery with cycles). From 50 to 5,000 kVAr in configurable steps.
Detuned bank with reactors
Reactor in series with each step of capacitors, tuned so that the resonance frequency is below the 5th harmonic. Prevents capacitors from amplifying harmonic distortion in networks with VFDs, UPS or rectifiers. Typical detuning: 7%, 5.67% or 14% depending on network.
Active Harmonic Filter (APF)
Four-quadrant inverter that injects compensation currents in real time, canceling harmonics generated by non-linear loads. Achieves THDi <5% (or <3%) and corrects PF simultaneously. Optimal solution when analysis shows THDi >20% or when IEEE 519 is contractual.
APFC + hybrid active filter
The APFC bank provides most of the reactive MVAR at low cost, while the active filter handles the dynamic residual and harmonics. Best cost-benefit ratio for medium-large plants with mixed linear and non-linear loads.
Study and measurement of energy quality
Measurement with network analyzer (Fluke 435 / Hioki 3197) for 7 days. Registers FP, THDi, THDv, dem. maximum and load profile. Report with recommended sizing, required MVAR, proposed solution and ROI.
How is the savings calculated on the CFE invoice?
The savings come from two sources: elimination of the penalty for low PF and reduction of the total current (less voltage drop, losses in conductors and heating of transformers).
Example — 500 kW industrial plant
FP actual: 0.78 → FP objetivo: 0.95
300 kVAr APFC bank (3 steps of 100 kVAr) with automatic controller and 7% detuned filters.
* Indicative values. The exact calculation is made with the data from the CFE invoice and the on-site measurement.
Implementation process
From diagnosis to commissioning, we guarantee that the solution eliminates the penalty from the first invoice.
Measurement and diagnosis
Installation of network analyzer for 7 days. Record of FP, THDi, THDv, maximum and minimum demand and hourly profile.
Design and engineering
Calculation of required MVARs, topology selection (fixed/APFC/detuned/APF), short circuit check and protection coordination.
Supply and installation
Delivery of the bank or active filter, installation in a dedicated panel or cabinet, connection to the bus and insulation tests.
Commissioning and verification
APFC controller adjustment, real-time FP verification and delivery of acceptance report with post-installation measurement.
Data necessary to size the solution
With this data we calculate the required MVAR and select the optimal bank or filter.
| Parameter | Source / How to get it | Why it is important |
|---|---|---|
| Current power factor | CFE invoice or measurement with analyzer | Determine the required correction MVARs |
| Active power (kW) and reactive power (kVAr) | CFE meter measurement or reading | Basis for calculating bank capacity |
| Bus voltage (V) | Electrical plan or measurement | Defines the rating of the capacitor (IEC 60831 Uc) |
| THDi level (%) | Power Quality Analyzer | Determines if detuned bank or active filter is required |
| Short circuit level (Icc kA) | Study of short circuit or transformer data | Sizes the interrupting capacity of the contactors/thyristors |
| Load profile (variability) | Measurement 7 days or production data | Defines whether a fixed or automatic bank is required in steps |
| CFE rate and demand charge | Last CFE invoice | Allows you to calculate monthly savings and ROI |
Manufacturers we work with
We select the brand and technology according to the voltage level, the required kVAr, the presence of harmonics and the project budget.
ABB
- CLMD (LV capacitors)
- LV CLMB Capacitors
- PQFS (active filter)
Schneider
- Varplusbox / Varplusbox H
- VarplusH (de-intonated)
- AccuSine (active filter)
SIEMENS
- SiCap (MV capacitors)
- SIVAR (APFC bank)
- SIPLINK (dynamic)
Reference regulatory framework
The standards presented are of a information and represent the most common technical framework for power factor correction projects. The regulations applicable to each project — including national standards, customer or competent authority requirements — are determined and agreed at the basic engineering stage in accordance with the specific requirements of the contracted scope.
LV power capacitors. Defines rated voltage, admissible overvoltage, dielectric strength, temperature and type and routine tests for capacitors < 1 kV.
MV power capacitors (≥ 1 kV). For medium voltage banks: 6–34.5 kV. Defines admissible overvoltage (1.10×Uc continuous), reactive current and protection coordination.
Power capacitor banks. Applies to complete assemblies (bench + reactor + protections). Design requirements, protection coordination and verification for installation.
Harmonics > 16 A per phase. Limits of THDi and individual harmonic currents in the PCC. Applies when the bank or load exceeds 16 A per phase in LV.
ANSI/IEEE harmonics standard. Reference for projects with NFPA/NEC codes. Defines THDv ≤ 5% and THDi limits according to the Icc/IL ratio in the PCC.
Quality of CFE supply. Establishes the allowable voltage, frequency and form factor ranges. Basis for determining whether the customer's network meets the required quality before installing the solution.
Common doubts about power factor
When does the CFE penalty apply for power factor?
What is the difference between a fixed bank and an automatic bank?
Why is the bench needed dettonized in networks with harmonics?
What advantage does an active harmonica filter have over a bank in the United States?
Does VMS Energy conduct the power factor study before Dapping the solution?
Stop paying CFE penalties from next month!
Share your last CFE invoice with us and we will calculate the potential savings at no cost. Installation in 2–4 weeks with guaranteed return on investment.