Banks of fixed, automatic, detuned capacitors and active harmonic filters. Study, supply and installation in Mexico. Regulations applied according to the project requirements.

cosa, target 0.95–0.98 National and international regulations Banks up to 5 000 kVAr Active filters THDi <5% ROI <18 months

Risk: active CFE penalty

HM, HS and H-SL rates include additional charge if cosφ < 0.90

The low power factor charge can represent up to 30% extra With a bank in the correctly-defined country of the country, the penalty disappears in the first month of operation.

0.90
minimum CFE threshold
3%
point-under-threshold surcharge
30%
maximum surcharge at coss= 0.80
0.95–0.98
optimal target with bank
<18m
Typical return on investment
0
penalty payments after installation
Supply Portfolio

Power factor correction solutions

The correct solution depends on the load profile, the presence of harmonics, the voltage level and the target cosφ.

Basic

Fixed capacitor bank

One or more stages of the bus permanently connected to the bus. Ideal for constant reactive loads (always on motors, furnaces, high power transformers). Easy installation and low maintenance cost.

Stable chargingFixed MVARIEC 60831Low cost
Industry standard

APFC Automatic Bank

Controller measures PF in real time and switches steps of capacitors (thyristors or contactors) to maintain target cosφ. Supports variable loads (production lines, machinery with cycles). From 50 to 5,000 kVAr in configurable steps.

Variable loadPFR ControllerThyristors/contactorsIEC 60831
Networks with harmonics

Detuned bank with reactors

Reactor in series with each step of capacitors, tuned so that the resonance frequency is below the 5th harmonic. Prevents capacitors from amplifying harmonic distortion in networks with VFDs, UPS or rectifiers. Typical detuning: 7%, 5.67% or 14% depending on network.

VFD/retifiersSeries reactorIEC 61921Antiharmonic
Power quality

Active Harmonic Filter (APF)

Four-quadrant inverter that injects compensation currents in real time, canceling harmonics generated by non-linear loads. Achieves THDi <5% (or <3%) and corrects PF simultaneously. Optimal solution when analysis shows THDi >20% or when IEEE 519 is contractual.

THDi <5%IEEE 519FP and harmonicsReal time
Hybrid

APFC + hybrid active filter

The APFC bank provides most of the reactive MVAR at low cost, while the active filter handles the dynamic residual and harmonics. Best cost-benefit ratio for medium-large plants with mixed linear and non-linear loads.

Mixed loadAPFC + APFCost-effective
Diagnosis

Study and measurement of energy quality

Measurement with network analyzer (Fluke 435 / Hioki 3197) for 7 days. Registers FP, THDi, THDv, dem. maximum and load profile. Report with recommended sizing, required MVAR, proposed solution and ROI.

7 days measurementNetwork analyzerTechnical reportCalculated ROI
Return on investment

How is the savings calculated on the CFE invoice?

The savings come from two sources: elimination of the penalty for low PF and reduction of the total current (less voltage drop, losses in conductors and heating of transformers).

Example — 500 kW industrial plant

FP actual: 0.78 → FP objetivo: 0.95

300 kVAr APFC bank (3 steps of 100 kVAr) with automatic controller and 7% detuned filters.

* Indicative values. The exact calculation is made with the data from the CFE invoice and the on-site measurement.

- > 85K < < >
Current monthly penalty
$0
Penalty with installed bank
-180K....
Estimated cost of APFC bank 300 kVAr
<3 months
Return on investment
VMS Energy Methodology

Implementation process

From diagnosis to commissioning, we guarantee that the solution eliminates the penalty from the first invoice.

Measurement and diagnosis

Installation of network analyzer for 7 days. Record of FP, THDi, THDv, maximum and minimum demand and hourly profile.

Design and engineering

Calculation of required MVARs, topology selection (fixed/APFC/detuned/APF), short circuit check and protection coordination.

Supply and installation

Delivery of the bank or active filter, installation in a dedicated panel or cabinet, connection to the bus and insulation tests.

Commissioning and verification

APFC controller adjustment, real-time FP verification and delivery of acceptance report with post-installation measurement.

Selection engineering

Data necessary to size the solution

With this data we calculate the required MVAR and select the optimal bank or filter.

ParameterSource / How to get itWhy it is important
Current power factorCFE invoice or measurement with analyzerDetermine the required correction MVARs
Active power (kW) and reactive power (kVAr)CFE meter measurement or readingBasis for calculating bank capacity
Bus voltage (V)Electrical plan or measurementDefines the rating of the capacitor (IEC 60831 Uc)
THDi level (%)Power Quality AnalyzerDetermines if detuned bank or active filter is required
Short circuit level (Icc kA)Study of short circuit or transformer dataSizes the interrupting capacity of the contactors/thyristors
Load profile (variability)Measurement 7 days or production dataDefines whether a fixed or automatic bank is required in steps
CFE rate and demand chargeLast CFE invoiceAllows you to calculate monthly savings and ROI
Multi-brand supply

Manufacturers we work with

We select the brand and technology according to the voltage level, the required kVAr, the presence of harmonics and the project budget.

ABB

  • CLMD (LV capacitors)
  • LV CLMB Capacitors
  • PQFS (active filter)
Low voltageHarmonic filtering

Schneider

  • Varplusbox / Varplusbox H
  • VarplusH (de-intonated)
  • AccuSine (active filter)
Low voltageDetunedHarmonic filtering

SIEMENS

  • SiCap (MV capacitors)
  • SIVAR (APFC bank)
  • SIPLINK (dynamic)
Medium voltageAutomatic compensation
Regulatory framework

Reference regulatory framework

The standards presented are of a information and represent the most common technical framework for power factor correction projects. The regulations applicable to each project — including national standards, customer or competent authority requirements — are determined and agreed at the basic engineering stage in accordance with the specific requirements of the contracted scope.

IEC 60831-1/2

LV power capacitors. Defines rated voltage, admissible overvoltage, dielectric strength, temperature and type and routine tests for capacitors < 1 kV.

IEC 60871-1

MV power capacitors (≥ 1 kV). For medium voltage banks: 6–34.5 kV. Defines admissible overvoltage (1.10×Uc continuous), reactive current and protection coordination.

IEC 61921

Power capacitor banks. Applies to complete assemblies (bench + reactor + protections). Design requirements, protection coordination and verification for installation.

IEC 61000-3-12

Harmonics > 16 A per phase. Limits of THDi and individual harmonic currents in the PCC. Applies when the bank or load exceeds 16 A per phase in LV.

IEEE 519-2022

ANSI/IEEE harmonics standard. Reference for projects with NFPA/NEC codes. Defines THDv ≤ 5% and THDi limits according to the Icc/IL ratio in the PCC.

CFE GDMTH-2022

Quality of CFE supply. Establishes the allowable voltage, frequency and form factor ranges. Basis for determining whether the customer's network meets the required quality before installing the solution.

Frequently asked questions

Common doubts about power factor

When does the CFE penalty apply for power factor?
CFE applies a penalty when the monthly average power factor falls below 0.90 in the medium voltage rates (HM, HS, H-Sh). The additional charge may reach 3% for each percentage point below 0.90. For example, a 0.80 FP can generate a surcharge of up to 30% on billable demand. The penalty is shown in the "Power Factor" line of the invoice and applies to the maximum demand charge.
What is the difference between a fixed bank and an automatic bank?
A fixed bank injects a constant amount of MVAR into the network. It is suitable when reactive charge is stable (engines running at constant charge, furnaces). Automatic bench (APFC) uses a controller that measures the FP in real time and connects or disconnects steps from the TUNES to keep the FP target (typically 0.95–0.98 inductive), even when the load varies during the day or week. The cost of the automatic bank is higher, but eliminates the risk of overcompensation (training VET, which also penalizes CFE).
Why is the bench needed dettonized in networks with harmonics?
In networks with variable frequency drives, UPS or switching power supplies, current harmonics can create parallel resonance with standard UMENTS, amplifying harmonic stresses and destroying capacitors in a few weeks. detonated bench It incorporates calibrated serial reactors so that the resonance frequency is below the 5th harmonic (300 Hz in 60 Hz system). The most common de-intonation is 7% (p=7) or 5.67% (p =5.67), depending on the dominant Ironic order.
What advantage does an active harmonica filter have over a bank in the United States?
A active filter (APF) Injects real-time compensation currents to cancel harmonica generated by non-linear loads, achieving THDi <5% or even <3%. In addition, it can simultaneously correct the power factor and dynamically respond to charge changes in microsecond cycles. The disadvantage is its higher cost (2–4× compared to an equivalent APFC bank). It is the preferred solution when the THDi exceed 20% or when the IEEE 519 standard is contractual and the THD in the PCC should be less than 5%.
Does VMS Energy conduct the power factor study before Dapping the solution?
Yes. VMS Energy performs a energy quality measurement With a network analyzer (Fluke 435, Hioki PQ3198 or similar) for 7 days to register FP, THDi, THDv, maximum demand and time load profile.With this data We decode the optimal bank or filter, calculate the savings on the CFE invoice month by month and present the expected return on investment. The study can be done with or without purchase commitment.

Stop paying CFE penalties from next month!

Share your last CFE invoice with us and we will calculate the potential savings at no cost. Installation in 2–4 weeks with guaranteed return on investment.

Schedule your survey