Industrial emergency plants
Sizing, supply, automatic transfer and maintenance of diesel and gas generator sets of any make, with testing to ensure they start and take on load when the grid goes down.
Size by actual load, not transformer nameplate
An oversized group works with low load and accumulates engine problems; a subsized group does not start large engines. These are the criteria we reviewed before proposing capacity.
Operating regime
Emergency (standby), main (prime) or continuous, in accordance with ISO 8528-1. The same engine has different capacities in each regime.
Engine starting
Starting current, allowable voltage drop and load starting sequence so that the group does not stop when taking on a large motor.
Non-linear loads
Variables, UPS and rectifiers distort the current; they affect the choice of alternator and voltage regulator.
Site and autonomy
Altitude and temperature reduce available power. We define autonomy, tank, fuel supply, ventilation and noise.
The transfer type decides what your process sees
The automatic transfer switch (ATS) is as critical as the engine. These are the options and what each one entails.
| Type | How it operates | What the load sees | When is it appropriate |
|---|---|---|---|
| Open transition | Disconnect one source and then connect the other | A short break in each transfer, including return to the network | Shear-tolerant loads; lowest cost option |
| Closed transition | Both sources in parallel for a moment, already synchronized | No interruption in network return and testing | Continuous processes and periodic tests without affecting production |
| Soft transfer | Sustained parallel; the load is transferred gradually | No interruption or loading step | Large or sensitive loads; requires interconnection protection |
| With bypass-isolation | Allows the ATS to be removed for maintenance without de-energizing | Continuity during maintenance of the ATS itself | Facilities that cannot schedule shutdowns |
Any scheme with momentary or sustained parallel with the network requires synchronization, interconnection protections and review with CFE in accordance with the Network Code.
Parallelism, redundancy and ballast shedding
Two or more groups in parallel provide N+1 redundancy and allow each machine to operate in its efficient range. In exchange, they require a controller that synchronizes them, distributes the load and disconnects loads when capacity is lacking.
Group Controllers
Specification, programming and commissioning of DEIF, Woodward and other manufacturers' controllers, integrated into the plant SCADA.
Board modernization
Replacement of obsolete control panels and synchrony with digital controllers, preserving the generator group when in good condition.
Hybrid with BESS
A BESS covers the start-up seconds, absorbs loading steps and reduces engine hours and fuel consumption in frequent-generation sites.
The complete logic of grid, generator, UPS, BESS and solar coordinated by an EMS is in Electrical Availability Architecture.
The most common cause of a plant not starting is that no one tested it under load
Dead batteries, degraded fuel, and engines that have only run at idle fail just when they are needed. Our maintenance program adjusts to the criticality of the loads and the manufacturer's recommendations.
| Frequency | Activities |
|---|---|
| Operational routine | Visual inspection, levels, leaks, battery charger and condition, jacket heater, start-up and operation |
| Periodic | Test with real load or with load bank, verification of automatic transfer, protection and voltage regulator settings |
| Annual | Extended test with resistive load bank, oil and fuel analysis, thermography of panels and connections, alternator insulation tests |
| Corrective and modernization | Diagnosis of starting or charging socket faults, repair of alternators, retrofit of controllers and transfer boards |
Reference regulations: current NOM-001-SEDE (emergency, legally required reserve and optional reserve systems), NFPA 110 for emergency and reserve power systems, and ISO 8528 for generating sets.
Transfers, parallelism and generators in critical service
Airport and auxiliary services
Mexico City
Modernization of the electrical transfer system of the emergency plant.
Maritime services of Campeche / Pemex — Nohoch-A2
Campeche probe
Manufacture, supply, testing and commissioning of a 3,200 A 11-switch automatic transfer panel.
Maritime services of Campeche / Pemex — Nohoch-A2
Campeche probe
A block with automatic transfer of 9 switches from 2000 to UL, hotspot monitoring and Profibus communication with the control SCADA.
P.S.S. Chemul
Campeche probe
Load sharing control for five 3,000 kW Wärtsilä motor generators, and new continuous power and synchronization system.
Cotemar — Atlas and Olimpo vessels
Port of Veracruz
Specialized maintenance to four 590 kW synchronous generators per vessel, in two service cycles.
Cotemar — Saturno vessel
Port of Veracruz
Specialized maintenance to two 1,280 kW brushless synchronous main generators.
Frequently asked questions
Do they sell emergency plants of any particular brand?
Can you give maintenance to a plant you didn't install?
How long does it take a plant to take charge?
Should the plant be replaced by a BESS?
Would your emergency plant start today with all the cargo?
We do a diagnosis with a load test and give you the real status of the group, the transfer and the control panel.