VMS Energy · EPC Industrial Wiring · Projects from 500,000 BDN

Electrical Electrical Cableling and Tendido Industrial

LV · MV · HV — from route to test protocol

Channel design, low, medium and high voltage laying, certified terminations and documented electrical tests — all under NOM-001-SEDE and IEC 60502. The cable installed correctly, with the protocol that proves it.

NOM-001-SEDE-2012 IEC 60502-1/2/4 Megger · Hi-Pot · VLF LV / MV 35 kV / HV 138 kV Protocol signed in each shortlist
18
years in electric EPC
138 kV
maximum level HV executed
Offshore
installation in ATEX area
100%
tests with signed protocol
CFE · PEMEX
clients reference
Scope of service

From route engineering to protocol delivery

Industrial electrical wiring does not end when the cable arrives at the site. It ends when the test protocol is signed and the system operates within the design parameters.

Route and pipeline engineering

Design of optimal trajectories, selection of the type of channeling (ladder tray, channel, ventilated, EMT/IMC/rigid conduit), segregation between power, control and instrumentation circuits, load calculation per section and supports. Delivery of floor plans and isometrics.

Manufacture and installation of trays and conduit

Custom manufacturing, cutting, bending and connection of metal trays and conduit. Installation of supports with spacing calculation in accordance with NEC and NOM-001-SEDE. Anticorrosive treatment in aggressive environments (offshore, petrochemical, food). Ground continuity throughout the network.

Cable twine, LV, MV and HV

Tended with minimum curvature radius by voltage level (IEC 60502), maximum pull voltage in large conductors (kcmil), ambient installation temperature and separation between circuits. Use of lubricant compatible with cable cover. Recording of tracked Kayas.

Certified terminations and splices

Thermo-retractile and resin finishes for LV (3M Scotchcast, TE Connect 98). Internal/outdoor dry-end kits and MV/HV joints (3M QT-III, Raychem HVT, Nexans). Installation by certified personnel; each completed completion documented with the kit used, serial number and installation responsible.

Electrical tests with protocol

Insulation resistance (megger 500V to 10kV depending on voltage level), conductor continuity, screen resistance, Hi-Pot DC or VLF dielectric strength test (0.1 Hz). Each test delivered in protocol with measured values, normative comparison and signature of the technical manager.

Firestop sealing of ducts

Installation of fire sealants in cable passages through partitions, slabs and walls classified in accordance with NOM-002-STPS and insurer requirements. 3M Firestop, Hilti CP and Rockwool systems. Installation certificate delivered by sealing point to support audits.

Technical specialization

Each level of voltage has its methodology

The technical requirements of a 480 V installation are not the same as those of 13.8 kV or 115 kV. The process, laying equipment and certification of completions are different in each case.

Low voltage — up to 1 kV

Distribution circuits, motors and lighting

  • THW-LS, THHW-LS, XHHW-2 conductors in AWG and kcmil sizes
  • EMT, IMC and rigid conduit with sealants in classified areas
  • Ladder and channel trays with power/control segregation
  • Megger 500 V — minimum value: 1 MΩ/km (IEC 60502-1)
  • Conductor continuity and resistance test
  • Labeling and marking in accordance with NOM-001-SEDE Art. 310
NOM-001-SEDE · NMX-J-010-ANCE · IEC 60502-1
Medium voltage — 1 to 35 kV

Main feeders, substations and MV motors

  • Unipolar XLPE and EPR cables with metal screen (copper tape or braid)
  • Radius of curvature: 12–15× outside diameter when laid (IEC 60502-2)
  • Minimum installation temperature: 0°C for cables without preheating
  • Finalizations Class 15/25/35 kV (3M QT-III, Raychem HVT)
  • Megger 5 kV — minimum 100 MΩ (before and after terminations)
  • Hi-Pot DC: 0.6 × Un × √2 durante 15 min, o VLF 0.1 Hz
NMX-J-098-ANCE · IEC 60502-2 · IEEE 400.2
High voltage — 35 to 138 kV

Underground transmission lines and substation entrances

  • Unipolar XLPE cables with copper screen and anti-corrosion HDPE jacket
  • Tended with winch and hydraulic tensioner — pull voltage log
  • Wet and dry finishings certified by the cable manufacturer
  • Vulcanized or prefabricated splices with high voltage sleeves
  • Megger 10 kV — pre and post installation diagnosis
  • VLF 0.1 Hz + dielectric loss measurement (as
IEC 60502-4 · IEC 60840 · IEEE 400 · CFE L0000-41
EPC Methodology

How we execute a wiring project

Each project follows the same control sequence — without skipping steps — regardless of the size of the contract.

1

Route engineering

We review the electrical single-line, visit the site, define trajectories, select the channeling system and calculate the tray loadability. We issue plans for the client's review before starting work.

2

Manufacture and installation of pipeline

We manufacture and install trays, conduit and supports according to approved plans. We verify ground continuity throughout the conduit system before laying the cable.

3

Cable tending

Tended with ambient temperature, curvature radius and maximum pull voltage. Recording of the personal personal data by circuit. Provisional labelling at both ends for identification before completion.

4

Terminations and splices

Preparation and execution of terminations by certified personnel. Record of the kit used, manufacturer's batch and installation person. Visual inspection of each termination prior to electrical testing.

5

Electrical tests

Megger, continuity, Hi-Pot or VLF depending on the voltage level. Each test documented in an individual protocol with the equipment used (with a current calibration certificate), measured values, environmental conditions and signature of the responsible technician.

6

Delivery and As-Built

Update of plans to As-Built condition, compilation of the installation dossier (test protocols, completion records, materials certificates) and presentation of results to the client. The system is ready for commissioning.

Electrical tests

Without signed protocol, the cable is not delivered

Each installed circuit is tested before delivery. The measured values ​​are compared against the manufacturer's and regulatory limits. The tests are the client's technical support against any future failure.

Megger IEC 60502

Insulation resistance

Measurement with digital tellurometer at 500 V (LV), 1–5 kV (MV) or 10 kV (HV). Detects moisture, contamination or mechanical damage to the insulation. It is performed before and after terminations to separate the state of the cable from the state of the termination.

Hi-Pot DC · IEEE 400.2

DC dielectric strength

Application of DC voltage at 0.6 × Un × √2 for 15 minutes with recording of the leakage current. A stable or decreasing current indicates healthy insulation. It applies to new or rehabilitated MV and HV cables. Does not damage the XLPE unlike the Hi-Pot AC power test.

VLF · IEEE 400.2

Very Low Frequency Test (0.1 Hz)

Test AC at 0.1 Hz as an alternative to Hi-Pot DC on HV cables. Prevents space charge buildup in XLPE that can cause the Hi-Pot DC "memory" effect. It is complemented by measurement of dielectric losses (tan δ) to diagnose the state of the insulation.

PD IEC 60885-3

Partial discharge detection

Measurement of partial discharges (partial discharge) in HV cables and MV/HV terminations. Detects manufacturing defects, mechanical damage to the display, or incorrect installation of terminations before they cause catastrophic failure. Recommended in new HV cables and in rehabilitations.

Micro-ohm · IEC 60228

Driver and screen resistance

DC resistance measurement of the conductor in micro-ohms to verify the actual cross section and the absence of hidden splices or damage to the conductor. The continuity of the metal shield is checked to ensure the return of ground fault currents.

IR · NET ATS

Post-service termography

Infrared thermographic inspection of terminations and connectors in the first 30 days of operation under load. A hot spot on a termination indicates insufficient tightening or a defect in the kit before it causes failure. We deliver the thermographic report as part of the installation dossier.

Reference projects

Cabling installations executed by VMS Energy

CH Angostura and CH Manuel Moreno Torres — CFE

Chiapas

400 kV power cable systems for hydroelectric turbines: two turbines in the first stage and four in the next.

Cement plant

Colima

Supply of 12.6 km power cable in medium and low voltage, including variable frequency drive power supply.

Grupo Sáenz — Ingenio Tamazula

Jalisco

Engineering, supply, installation and channeling of 4.1 kV medium voltage cable from the distribution board to the generator.

BALAM-TD Platform — Pemex

Campeche (offshore)

Supply and installation of power cable 500 KCM, 600 V for VDF-46 and VDF-47 variable frequency drives, with dismantling of damaged cable and electrical testing of new cable.

MALOOB-C, -D, -E and -I platforms — Pemex

Campeche (offshore)

Electromechanical work on the deck on four platforms: power cables and fiber optics.

BALAM-A Platform — Pemex

Campeche (offshore)

Installation of trays and cable laying to enable the new frequency converter and associated transformers.

EK-A Platform — Pemex

Campeche (offshore)

Preparation, installation and interconnection of medium voltage terminals for the power circuits of the generation system.

AKAL-C7 Platform — Pemex

Campeche (offshore)

Replacement of the force circuits of Module 1, with dismantling of existing electrical circuits.

Saipem

Tabasco

Supply, installation and testing of 4.16 kV relief cones.

The cable installed correctly — with the protocol to prove it

Request a technical proposal for your wiring project. We indicate voltage levels, estimated leeties, site conditions and testing requirement to respond with scope and price within 5 business days.

Frequently asked questions

What is the difference between cable supply and cabling service?

The cable supply is the procurement of the material (conductor, insulation, sheath) in accordance with the technical specification. The EPC cabling service additionally includes route design, channeling plans, manufacturing and installation of trays and conduit, cable laying respecting curvature radii and installation temperatures, certified terminations and documented electrical tests (megger, Hi-Pot, continuity). VMS Energy provides both services in an integrated manner.

What rules apply to industrial electrical wiring in Mexico?

The main standards are: NOM-001-SEDE-2012 (general electrical installations), NMX-J-010-ANCE (LV conductors and cables), NMX-J-098-ANCE (MV power cables), IEC 60502-1 (LV cables up to 1kV), IEC 60502-2 (MV cables 1-30kV), IEC 60502-4 (HV cables). For CFE projects, the CFE L0000-41 specification and the company's design criteria additionally apply. In installations with fire risk, NOM-002-STPS also applies for fire sealing of ducts.

What electrical tests do you perform after installing the cable?

Standard tests include: insulation resistance (megger at 500V for LV, 1kV–5kV for MV, 10kV for HV), conductor continuity and resistance check (micro-ohm), screen or shield continuity, and Hi-Pot dielectric strength test (DC at 0.6Un for 15 min for MV/HV, or VLF at 0.1Hz for HV cables without capacitive damage). Each test is delivered in a signed protocol with measured values ​​and comparison against regulatory limits.

What is the minimum radius of curvature for medium voltage cables?

According to IEC 60502-2 and manufacturers, the minimum bend radius for metal-screened single-core MV cables is generally 12 to 15 times the outer diameter of the cable during cold installation, and 8 to 10 times in static service. For triplex or armored cables the factor may increase. We always check the manufacturer's specific value of the supplied cable before laying.

Can you install wiring in classified areas (ATEX/NEC)?

Yes. In classified areas we install rigidly fitted with Firewalled Sewers (NEC Art. 501), Ex-e or Ex-d certified Ggs for entrances to certified boards, and environmentally-friendly covered cables (hydrocarbon resistant, FR-XLPE, etc.). The entire installation is documented according to the requirements of qualified area classification.

How much cable can you install per day in an industrial plant?

Performance varies depending on stress level and site conditions. In LV with pre-installed ladder tray: 500–1,500 m/day per crew. In MV (15kV unipolar XLPE cables): 200–500 m/day per triple, depending on the route and available laying equipment. In HV (cables >35kV): the laying speed is determined by the capacity of the reel and the complexity of the terminations, which are the most time-critical operations.

Do they include the design of the portable trays and the "Hungry"?

Yes. The channeling design includes: selection of the tray type (stack, channel, ventilated, floor), load calculation per stretch, support design (space, type of anchoring, materials according to environment), separation between power circuits, control and instrumentation, and design of the "Tracks" in areas where the trays are not applicable. We deliver isometric and plant planes with dimensions and specification of material.

Do you restore sealed firewall of Dodos and Mamparas?

Yes. We install Firewalling Machines in all cable steps through mamhars, slabs and walls classified as fire barriers, according to NOM-002-STPS and the requirements of the insurer. We use 3M Firestop, Hilti CP and Rockwool systems, with a seal point installation certificate delivered to the customer.