Coordinated shipping for industrial projects | Technical advice prior to purchase | VMShop by VMS Energy
Extra high voltage line

Extra high voltage cables 66–400 kV

EHV supply for critical lines and substations, with international technical control and logistics.

  • ✓EHV engineering and specification
  • ✓Type tests and documentation
  • ✓Phased coordinated delivery

Available constructions

Six metal sheaths on the same XLPE core. The choice depends on the terrain, the depth and the level of watertightness required by the project.

Available manufacturers: KEI Wires & Cables (Mexico stock) · Südkabel (German manufacturing, highly engineered EHV projects)

Six constructions on the same core

All six share a conductor, insulation and screens. What changes is the Metal sheath — layer 7 — and with it watertightness, weight, radius of curvature and cost. Choose one to see your cut and your decoil layer per layer.

A Flat aluminium sheath

Unipolar power cable with XLPE insulation. Smooth aluminum sheath longitudinally welded.

Exploded view, from the center outwards

    How we work

    EHV technical management and supply with risk control.

    1

    Diagnosis

    We raise electrical and regulatory requirements.

    2

    Specification

    Construction, testing and technical documentation.

    3

    SUPPLY

    Scheduled delivery and complete traceability.

    Manufacturer portfolio

    We did not arrive with a single catalogue. We arrive with the correct specification for your project.

    VMS Energy selects the optimal manufacturer according to the voltage level, sector, applicable standard, availability and timeline of your project. KEI Wires & Cables is our main strategic partner, but we work with the best manufacturers in the world when the project requires it.

    KEI Wires & Cables

    Authorized representative for Mexico. MV/HV/EHV power, ESP cables for Oil & Gas, photovoltaics, instrumentation and control. First option for most industrial projects in Mexico.

    Südkabel

    Specialty in highly engineered EHV cables (German manufacturing). Ideal when the project requires European standards, VDE certifications or special constructions for extra high voltage transmission.

    Helukabel

    Solutions for control, testing and special applications: LSZH for confined spaces, EMC armored, high temperature (silicona), cables for food industry and robotics.

    Condumex / Viakon

    Domestic manufacturing under NMX-J. Low voltage and control with short delivery times. Ideal for projects with a required national component or emergencies in the field. NOM-001-SEDE compliance.

    Integrated EPC

    When VMS supplies the cable, you already know how it will be installed — because we are the ones who will install it.

    Through VMShop you can request a cable quote directly — with or without an EPC project. If the supply is part of an EPC project that VMS engineers and builds, the cable is integrated into the MTO with milestone logistics and single responsibility. If you only need the material, we also support you with the same technical rigor.

    • Engineering: We specify the correct cable based on load, route, environment and regulations — not the cheapest cable in the catalog.
    • Coordinated MTO: The cable BOM is synchronized with the construction schedule, not the supplier's inventory.
    • Logistics by milestones: We deliver cable when the job needs it, in the correct quantity and with complete traceability per reel.
    • Sole responsibility: A single company responds by specification, supply, installation, testing and Aing.

    If you only need uninstalled supplies, we can also support you — with the same technical and logistical rigors we apply to our EPC projects.

    Target applications

    • EHV transmission lines and branches
    • Interconnection of critical substations
    • Expansion of industrial electrical infrastructure

    Value for your project

    • Technical review of specification and scope
    • Alignment with standard requirements
    • International and phased logistics planning
    EHV Engineering Notes

    Key criteria for extra high voltage projects (66–400 kV)

    EHV projects require more than a cable provider. They require an integrator who coordinates detailed engineering, type testing, splicing, terminations and commissioning under a single person.

    • Type tests: Verify that the manufacturer has IEC 60840 / IEC 62067 tests in force for specific construction. Request laboratory reports, not just compliance statements.
    • Manufacturing times: Custom-made EHV cable requires between 16 and 28 weeks of factory manufacturing. This time must be built into the EPC schedule before committing to any go-live date.
    • Splices and terminations: They are a critical part of the system. VMS coordinates the supply of compatible accessories (pre-moulded splices, interior/outdoor finishes) and can run the installation with specialized personnel.
    • Applicable standards: IEC 60840 (66–150 kV), IEC 62067 (150–500 kV). For interconnections with CFE, review current LAPEM technical specifications. For projects with international financing, check if the bank requires IEEE or BS.
    • International logistics: Südkabel (Germany) and KEI (India) require coordination of import, customs clearance and specialized transport for large-format coils. VMS manages the entire process.
    IEC 60840 IEC 62067 LAPEM/CFE IEEE Std. BS 7870

    Terms like EHV, U0/U, LAPEM, IEC 60840 o IEC 62067? Consult them in the Cable technical glossary

    Frequently Asked Questions — Extra High Voltage

    How long does it take to make an EHV cable?

    Between 16 and 28 weeks depending on voltage level, section and manufacturer. This time must be included in the EPC schedule from the basic engineering stage. VMS alerts about this period in the initial diagnosis.

    Which manufacturers drive for EHV?

    KEI Wires & Cables for most projects. Südkabel (Germany) for projects that require European manufacturing, VDE regulation or high engineering standards. The selection depends on the stress level, project standard and schedule.

    Does VMS also install the EHV cable or only supply it?

    VMS Energy is an EPC contractor. We can integrate supply, laying, splicing, terminations and high voltage tests (hipot, partial discharges) under a single contract. This integration eliminates the risk of interfaces between contractors.

    What minimum project justifies EHV management with VMS?

    There is no minimum size. We have coordinated everything from single circuit branches to complete transmission lines. What we do require is that the project has a technical specification or at least defined operating conditions to begin the diagnosis.

    Reference projects

    High and extra high voltage projects executed

    CH Angostura — CFE

    Chiapas

    400 kV power cable systems for two hydroelectric turbines.

    CH Angostura and CH Manuel Moreno Torres — CFE

    Chiapas

    400 kV power cable systems for four hydroelectric turbines.

    Extra high voltage cables for transmission — quote your project

    Supply for large-scale transmission and generation networks. Technical support and traceability of origin.