Food & Beverages · Starting at $1,000,000 MXN

Electrical Automation for the Food and Beverage Industry

We integrate Rockwell, Siemens, Schneider and ABB equipment in plants across Mexico without replacing your current technology, with execution planned to avoid production downtime. Clients: Coca-Cola, Grupo Modelo, IFF.

Served bottling plants MV/HV substations on floor Integrated process variables
24/7
Emergency response
IP65
Equipment for humid environments
NOM
Regulatory compliance
<2 %
Target THD in plant
>0.95
Target power factor
Challenges in the sector

What keeps the electrical maintenance manager awake at a food plant

Electrical engineering in food and beverages faces three simultaneous pressures that do not exist in other sectors: continuity without margin of error, auditable safety and energy efficiency with a direct impact on margin.

01

Line continuity — no margin

An unplanned two-hour power cut on a filling line, edging or cold chamber can mean loss of complete batch, rejection by quality control and customer penalty. In continuous process, the cost of an unprogrammed stoppage far exceeds the cost of any preventive maintenance program. There is no room to improvise with plant electricity.

02

Safety in electrical installations

The COFEPRIS, BRC Global Standard and FSSC 22000 audits include the state of electrical installations in their evaluations. Panels without adequate IP grade in humid areas, wiring without sealed conduit in process areas or equipment without NOM registration can lead to major observations or temporary closure. The electrical installation must be as auditable as the production process itself.

03

Energy cost over operating margin

With HM/HS rates on the rise, oversized motors running at part load and power factor below 0.90, additional charges on the CFE bill are real and avoidable. Harmonics greater than 5% THD reduce the useful life of transformers and CCMs. Electrical efficiency requires specific engineering, not just intention.

Specialized services

Electrical solutions for each stage of the production process

From the main medium voltage power supply to the control of each motor in the filling line — we integrate the entire electrical chain under the same technical manager.

MV/HV substations for process plant

Design and installation of substations at 13.8 kV, 34.5 kV and 115 kV with dry or oil transformers, shielded switchgear and selective protections. We comply with NOM-001-SEDE and coordination of protections for critical process loads.

, NOM-001-SEDE · IEC 62271 · I

Speed changers for process

Selection, installation and commissioning of VFDs for product pumps, compressors, conveyors and mixers. IP54/IP65 cabinets compatible with CIP/SIP cleaning environments. Integration with SCADA and Profibus, Modbus, EtherNet/IP protocols.

, IEC 61800 · NEMA 4X · Siemens · ABB · TRIOL

Automated MCC and process control

Motor control centers with soft starters, integrated drives and PLC for automation of production lines. Design under IEC 61439 with segregated compartments, communication bus and real-time monitoring.

, IEC 61439 · IEC 60947 · Profibus · Modbus R

Electrical predictive maintenance

Preventive-predictive maintenance programs with infrared thermography (NETA MTS), VLF tests on MV cables, DGA analysis on transformers and power quality measurement (harmonics, flicker, unbalance). Reports with risk traffic light and action plan.

, NETA MTS · IEC 60599 · IEEE 519 · ISO 18434

Power factor correction

Design and installation of automatic capacitor banks to maintain PF >0.95 and eliminate reactive energy charges in the CFE rate. Previous analysis of harmonics with passive filters when required. Typical ROI: 12–24 months.

, IEC 60831 · IEEE 18 · NOM-016-ENER · HM

Industrial lighting and energy efficiency

Industrial LED lighting projects in production areas, warehouses and cold rooms with compliance with NOM-025-STPS (illuminance levels per area). Energy efficiency studies and audits under NOM-016-ENER to reduce total electrical consumption.

, NOM-025-STPS · NOM-016-ENER · I

Intervention cycle

Electrical accompaniment in each phase of the operation

We structure our electrical intervention to adjust to the calendar of stoppages and peak production seasons of each plant.

Scheduled shutdown
Jan / Jul
Major maintenance to substation, transformers and switches. VLF tests on MV cables. Preventive component replacement.
Season start
Feb / Aug
Commissioning of updated drives and MCC. Load tests, protection synchronization and verification of PLC parameters.
Continuous operation
All year round
Quarterly predictive monitoring: IR thermography, power quality, DGA analysis. Quick response to failures with specialized technicians <24 hours.
Energy audit
Dec / Jun
Analysis of consumption, power factor and harmonics. Improvement plan for the next cycle: rate optimization, motor efficiency and LEDs.
Regulatory compliance

Electrical standards that every plant engineer should know

In the food industry, electrical installations must not only be safe — they must be auditable and compatible with safety requirements.

Norm / StandardScopeApplication in F&B plant
NOM-001-HEADQUARTERSElectrical installationsBase design of all electrical installations in Mexico; required by COFEPRIS in audits
NFPA 70 (NEC)Electrical codeAreas with combustible powders (harines, sugar) — classification of hazardous areas
NOM-025-STPSLightingMinimum illuminance levels in production, visual inspection and warehouse areas
IEC 61439Beverages and MCCManufacturing and verification of motor control centers for food processing
IEEE 519HarmonicsCommon coupling point harmonic distortion limits (THD <5%)
NOM-016-ENEREnergy efficiencyEnergy audits and minimum efficiency requirements in electric motors
Projects executed

Clients in the food, beverage and process industry

Accredited experience in bottling plants, process plants and industrial production with highly demanding electrical infrastructure.

Soft Drinks Bottling Company, Colima
Colima, Mexico
Engineering, supply, installation and commissioning of a 200 HP Triol brand variable speed drive.
Beverage Plant
Colima, Mexico
Maintenance of electrical substation, four transformers and low voltage distribution boards, with thermography, megger tests on wiring and operation tests on switches.
Biopaper Atenquique
Jalisco, Mexico
Testing and calibration of the power plant power relays.
Ultra Papers
State of Mexico
Work in force plant: repair of two mechanical governors PGPL and commissioning of one of them in the 5 MW TG1 Turbogenerator.
PIASA Group
San Luis Potosí, Veracruz and Oaxaca
Construction of an electrical substation; and eighteen medium voltage electrical engineers for the connection of substation to panels and motor control centers in the group's sugar mills, among them Tres Valles and Adolfo López Mateos.
Model Group
Mexico
VMS Energy customer in the beverage industry.
Beta San Miguel
Mexico
VMS Energy customer in the agribusiness industry.
Value proposition

Why food and beverage plants choose VMS Energy

We're not just an electrical equipment supplier — we're the outside plant engineer who understands that every minute of downtime has a real cost.

Zero interference in production

We plan all work during scheduled shutdown windows. If there is an emergency outside the window, we activate rapid response protocols with safe isolation without stopping adjacent lines.

Auditable documentation

We deliver a complete technical dossier: As-Built drawings, test protocols, calibration certificates and operation manuals. Documentation ready for COFEPRIS, BRC or FSSC 22000 audits.

Safety compliance

We use materials and finishes compatible with food processing environments (stainless steel, IP65 seals, approved epoxy paints). We apply certified LOTO in each intervention.

SIEMENS ABB Schneider Electric TRIOL VFD Leroy Somer Woodward digits Eaton
Frequently asked questions

What plant engineers ask

We work with electrical maintenance plans in scheduled stop windows and apply predictive maintenance (IR, VLF on MV cables, DGA on transformers) to detect failures before they affect production. Our emergency response time is less than 24 hours with field technicians.
Food plants must comply with NOM-001-SEDE (electrical installations), NOM-025-STPS (lighting), NOM-COFEPRIS for safety in facilities, NFPA 70 for areas with risk of combustible dust and IEC/IEEE for equipment in humid or corrosive environments (IP65+). VMS Energy knows these demands and designs its facilities to meet them from basic engineering.
We have a quick response service with specialized technicians available in less than 24 hours at any plant in the country. For clients with a preventive-predictive maintenance contract, the priority of attention is immediate with remote diagnosis when possible.
Yeah. We select variable frequency drives with IP54/IP65 cabinets and we install with seals and materials compatible with food processing environments. We have integrated TRIOL, ABB and Schneider variable frequency drives into bottling machines and process plants with frequent CIP (Clean-in-Place) cycles without affecting the life of the equipment.
Yes. We deliver complete EPC projects: detail engineering, equipment supply (processors, MV switchgear, MCC, cables), construction, FAT/SAT testing and commissioning. We have executed plant extensions in bottling machines and process plants without affecting the active production line during execution.
Plants with power factor less than 0.90 pay additional charges of 1–3% of total consumption on their CFE bill. With properly sized automatic capacitor banks, the typical return on investment is 12 to 24 months. In addition, losses in cables and transformers are reduced, extending their useful life by up to 15%.
We work with Siemens, ABB, Schneider Electric, Eaton, TRIOL, Leroy Somer, Cutler-Hammer and certified national manufacturers, selecting the right equipment according to the application, availability of spare parts in Mexico and specific customer process requirements.

Ready to protect the continuity of your plant?

A VMS specialist checks your electrical infrastructure and gives you an initial diagnosis at no cost for your food or beverage plant.

Electrical engineering for the food and beverage industry

VMS Energy implements EPC electric projects for food, beverage and packaging production plants in Mexico.

Contact specialist