Annual inspection checklist — HV, MV and LV electrical substations
Reference template for annual inspection and maintenance of industrial substations. Aligned with NOM-001-SEDE-2012, NOM-029-STPS-2011, IEEE C57, IEEE 80 and best industrial practices. This template is not a substitute for a formal protocol with calibrated test equipment — it is a roadmap for planning and auditing.
0. General information
How to use: mark each executed item. Writes measured value when applied. For absum with deviation, add note in section 11 (Hallazgos). PPE: apply corresponding category NFPA 70E analysis and PPE before starting.
1. General visual inspection of the premises
2. Power transformer NMX-J-169-ANCE · IEEE C57.152
Visual and mechanical inspection
Electrical and analytical tests
3. Power switches IEC 62271
4. Disconnectors and blades
5. Instrument transformers (TC and TP)
6. Protection systems and relays NOM-001-HEADQUARTERS
7. DC auxiliary services and battery bank
8. AC auxiliary services
9. Ground mesh and lightning arresters IEEE 80 · IEEE 81
10. SCADA, communications and thermography
11. Findings, deviations and recommendations
List items detected out of spec with severity (High / Medium / Low) and recommended remediation period.
12. General opinion
Name, ID and date