EPC Solar Industrial · Projects from $1,000,000 MXN

Turnkey Industrial Solar EPC

Design, construction, CFE grid interconnection, commissioning and monitoring of photovoltaic projects starting at 500 kWp, under a single contract.

Industries we serve with solar

We design industrial photovoltaic systems for the sectors with the highest energy consumption and critical operational continuity in Mexico and Latin America.

Challenges in the sector

What stops the decision to install solar in the industry...

01

Real TIR vs. initial model — the gap that no one anticipates

PV sizing that does not consider module degradation, partial shading, and actual switchgear temperature produces generation projections 8-15% higher than operation. This difference compromises the return committed to the investment committee.

02

CFE interconnection — the silent bottleneck

The MV interconnection ruling procedures under NOM-001-SEDE and the CFE contract can take from 3 to 9 months if the link engineering is not ready from the beginning. A solar project paralyzed in ruling continues to generate financial costs without producing a kWh.

03

Quality of solar energy in the production process

Variable generation can introduce harmonics and micro-outages into sensitive production lines—paint, pharmaceutical, electronics—if proper backup or filtering is not integrated. The generator-grid transition without controlled bypass is another frequent risk point.

What we solve

We integrate end-to-end industrial solar solutions to reduce energy costs, improve sustainability and ensure operational performance.

See other solutions
Industrial solar engineering in plant
Engineering

Solar Solution Engineering

Photovoltaic system, energy modeling and definition of electrical architecture for plant.

Systems integration and testing
Integration

Integration and Assembly

Integration of modules, inverters and electrical panels with coordination of on-site assembly.

Commissioning and operational delivery of solar system
Commissioning

Commissioning and Delivery

Performance testing, protection verification, connection and documented operational delivery.

Insignia VMS Energy — EPC since 2008
18 years implementing EPC projects
Badge 24/7 VMS Energy support
24/7 technical support in critical phases

How we execute it

From energy evaluation to commissioning, with technical traceability and phased execution.

Related cases

Implementations of solar generation and energy integration for industry with efficiency and resilience objectives.

Energy infrastructure with solar integration
Electrical Infrastructure

Geothermal Plant

Integration of electrical infrastructure to improve energy efficiency and reliability.

400 kV power cable systems in CH Angostura
Electrical EPC

CH Angostura 400 kV

400 kV power cable systems for hydroelectric turbines, with execution in critical environment.

Increase in capacity in MV substations
Food and Drinks

MV substations

Increase in capacity with operational continuity in the plant.

Industrial Solar FAQ Banner

Frequently asked questions

What includes an industrial solar energy solution?

Includes engineering, technical supply, assembly, testing, interconnection and commissioning of the solar system.

Can you work in stages without stopping surgery?

Yes. We plan intervention windows and execution phases to minimize operational continuity impacts.

Do you manage the interconnection procedure with CFE?

Yes. We prepare the network impact study, complete technical documentation and accompany the opinion process until the contract of interconnection is signed in MV or LV.

What investor technologies do they use?

We select according to power, redundancy and required SCADA protocol: SMA, Sungrow, ABB, Fronius. We provide string monitoring with real-time dashboard and monthly report.

Can Bss storage be integrated into the solar system?

Yes. We design hybrid solar+BESS systems with dispatch algorithms, and on-island operation for plants with maximum demand restrictions.

What monitoring does the project include?

Real-time dashboard with performance vs PVsyst, alerts per string, module and inverter temperature, and monthly report of energy generated with system availability.

How long does an industrial solar project last from engineering to start-up?

Engineering and management of CFE opinion: 8-14 weeks. Equipment supply: 6-12 weeks. Installation and commissioning: 4-8 weeks depending on power and access to the site.

What guarantees do you offer in the supply of panels and investors?

Photovoltaic modules with a 12-year product warranty and a 25-year linear performance warranty (>80%). Inverters with a 5-10 year factory warranty depending on the manufacturer, extendable with a maintenance contract.

How do we start a project?

Share your requirement in the contact form and we define scope, times and technical proposal.

Interactive catalog

Filter by category and quickly find the right service for your project.

Showing 0 services

We did not find services with these filters. Try another category or keyword.

Specialized cable for industrial solar

A solar park has four different cable fronts — each with its own physics, regulation and fault mode. Confused a string cable with a trunk cable or an AC with an interconnection MV is the most frequent cause of premature rating and CFE decision problems. We supply the four fronts integrated into EPC reach.

Strings DC

Module to combiner box — PV1-F

PV1-F KEI cable, Class 5 tinned copper conductor, halogen-free cross-linked polyolefin insulation. Nominal voltage 0.6/1 kV AC, up to 2000 V DC. Typical sections 4–16 mm². Useful life 30 years with resistance to UV, ozone and thermal cycles.

View catalog PV1-F →

DC trunks

Combiner box to central inverter

PV1-F in larger sections (25–50 mm² or more depending on the power of the central inverter and voltage drop limit). For underground runs, specify additional cover or pipe protection — the standard PV1-F is not for direct burial.

What is Class 5? →

AC Output

Inverter to step-up transformer

LV/MV power cable on the AC side of the inverter. Selection by nominal current of the inverter, distance to the transformer and voltage drop limit. Construction with reinforcement for typical buried sections in utility scale parks.

See power cable →

CFE interconnection

MV to the interconnection point

MV XLPE power cable for the section from the park substation to the interconnection point with CFE. Typical voltages 13.8–34.5 kV. Specification under LAPEM so that the CENACE/CFE interconnection ruling is not hindered by cable issues.

See power cable MV →

PV1-F Quick Selection Guide by Application

Application Typical section Allowable current*
Standard String4–6 mm²42–52 A
Long String / High Current10–16 mm²76–95 A
Troncal DC to investor25–50 mm²125–185 A
Long trunks / Green scale70–120 mm²239–335 A

* Reference values ​​at 40 °C in air according to KEI PV1-F technical sheet. Final selection adjusts for actual site temperature, clustering, and project voltage drop limit. What is ampity?

What VMS Energy provides

We size gauges for string and trunk, specify the AC and MV cable under LAPEM, manage the interconnection opinion with CENACE/CFE and deliver the cable coordinated with the module installation schedule. A single technical responsibility from the DC to the interconnection point.

Photovoltaic inverters inject harmonics into the grid. Compliance with IEEE 519 in the PCC is a requirement of the CENACE Network Code. See energy quality analysis →

Ready to quote your industrial solar project?

We analyze demand, scope and ROI to send you a technical proposal. We will contact you in less than 24 business hours; The proposal time depends on the scope. Projects from $1,000,000 MXN.

Reference projects

Photovoltaic systems in marine platform

Autonomous photovoltaics for offshore installations: arrangement, load control, investment and backup in batteries, where there is no grid to connect to.

AKAL-H Platform — Cotemar / Pemex

Campeche (offshore)

Installation and commissioning of a photovoltaic system on a platform.

AKAL · Zonda — Campeche Maritime Services / Pemex

Campeche (offshore)

Manufacture, supply and pre-operational electrical testing of a photovoltaic system composed of photovoltaic array, charge control unit, power inverter, battery bank and distribution board.

Cotemar

Ciudad del Carmen, Campeche

Supply of solar panels for gas and fire system.

Developed by the VMS Energy digital team · v10.1
Copyright 2026 VMS Energy
Contact us Basic form