Isolated microgrids

Microgrids for remote sites

Reliable power beyond the grid: generation, solar and BESS under unified control for mines, camps and wells. Less fuel, fewer engine hours and resupply trips, without compromising operational continuity.

Mining, Oil & Gas and pumping Multi-brand integration Isolated offshore generation
Operate only on diesel

The most expensive liter is the one that burns at low load

A Threaded generation system for the start peak spends most of the day well below its capacity. That safety margin is paid every day in fuel, maintenance and logistics.

Low load motors

A group operating well below its rated power consumes more litres per kWh delivered and accumulates unburned fuel in the exhaust, forcing additional corrections and maintenance.

Fuel logistics

Pipes, roads, storage, losses and risk of shortages. In a remote location, each liter costs much more than its purchase price.

Engine hours

Each hour of operation brings the next service and the next overhaul closer. Operating more groups than necessary multiplies the maintenance cost.

A weak network

Starting a pump or large mill causes voltage and frequency drops that can trip other loads. Without coordinated control, the answer is to turn on more generators “just in case.”

How to integrate

Four layers operating as a single network

The generators provide the firm foundation, the solar provides the cheapest energy of the day, the BESS absorbs variations and starts and the EMS/PMS decides how many groups should be online at any given time.

Simplified diagram of an isolated microgrid for remote site Without connection to the CFE network. Diesel or gas generators, a photovoltaic solar fix and a BESS are connected to the microgrid bar. Critical loads come from the bar through an UPS, pumping and processing charges, camp and non-essential loads, which can be disconnected. An EMS or PMS monitors and controls all sources and de-linking. EMS/PMS dispatch and de-link Generators diesel or gas · N+1 Solar FV controlled penetration BESS form network and reserve CFE Network not available Microgrid bus UPS Critical loads control, gas and fire, IT Pumping and process start with VFD Camp services and offices Non-essential deslastran
Power Control and communication. Conceptual diagram: each site defines its topology in detailed engineering.
CloakRole in isolated microgridWhat to take care of
Thermal generationFirm base and reserve: nights, cloudy days and large loads. Diesel, gas or bi-fuel.Minimum load of each group, synchronization and distribution of active and reactive load
Solar photovoltaicLower cost energy during the day; each solar kWh is fuel that does not burnHow much variability can the system absorb without affecting voltage and frequency
BESSQuick reserve that allows turning off groups, softening the solar and supporting motor starts; with grid-forming inverters, supports the microgrid by itselfSizing by power and energy, expected cycles and environmental site conditions
EMS/PMSDecide how many groups operate, how much solar input, when the BESS charges and discharges and what loads are ballastedSite-tested logic and a safe downgrade mode if the control goes out of service
ProtectionsIsolate faults without shutting down the entire siteWith inverter-based sources the fault current is low: coordination is studied for each combination of online sources
Without replacing what already works

A microgrid can be built in stages

There is no need to replace the generation park. Each stage is paid for with what you save and prepare for the next.

Stage 1

Generation control

PMS with automatic start and stop according to demand, load distribution and ballast shedding by priority. Only the necessary groups operate, close to their efficient load.

Stage 2

Storage

The BESS takes over the rolling reserve and the engine starts, which allows turning off groups that today operate only "just in case."

Stage 3

Solar

With BESS and control in operation, solar is integrated with the penetration that the system supports, without compromising the stability of the site.

Where applies

Sites where the network does not reach or not reach

The same architecture adjusts to the scale of each operation: from a pumping well to a complete mining unit.

Mining

Drainage pumping, processing plants, workshops and camps in remote units or with insufficient connections for expansion. Mining solutions

Oil & Gas

Wells, compression and pumping stations and offshore facilities, where own generation is the only supply. Solutions for Oil & Gas

Camps and work

Construction fronts, linear project camps and temporary works that require energy for months or years, with relocatable equipment.

Pumping and agribusiness

Irrigation wells, water pumping and agro-industrial processes in rural areas with weak networks or frequent failures. Solutions for agro-industry

Applicable experience

Electrical systems already operating without backup network

A marine platform is an isolated microgrid: all its energy is generated, synchronized, protected and distributed on board. Each reference corresponds to one of the pieces that form a microgrid on land.

P.S.S. Chemul

Campeche probe

Supply, configuration and start-up of load sharing control for five Wärtsilä 3,000 kW motor generators.

Akal-J process center (Diavaz)

Campeche (offshore)

Load segregation system engineering: what is disconnected, in what order and under what condition when generating capacity is missing.

Akal-J3 — Pemex

Campeche (offshore)

Adaptation, installation and connection of control and measurement signals of the protection relays of the TG-01 and TG-02 turbogenerators.

Maritime Services Campeche / Pemex

Campeche

Manufacturing, supply and testing of an autonomous photovoltaic system with charge controller, inverter, battery bank and distribution board.

Cotemar / Pemex

Campeche

Installation and commissioning of a photovoltaic system, and supply of solar panels for the gas and fire system.

Mining unit

Durango

Supply and commissioning of a 700 HP Altivar 980 variator to pump a 900 m water column. See the case

How we work

From fuel log to source loss test

1. Uprising

Measured load profile, fuel logs, cost per liter placed on site, group status, irradiation and space and access restrictions.

2. Modeling and sizing

Time-by-hour simulation of the dispatch, mixing of sources, study of the largest engine start, short circuit and coordination of protections.

3. Supply and installation

Procures multi-brand, equipment in container or skid when it is convenient to relocate it, assembly and integration with the existing generation without stopping the operation.

4. Testing and operation

Loss of a group, major load startup, ballast shedding and degraded mode, with signed protocols, training and maintenance.

Economy and regulatory framework

What defines savings and what the law requires

What defines savings

  • The real cost of the liter placed on site, with freight, storage and losses.
  • The hours of operation and the average load of each group.
  • The irradiation of the site and the shape of the load curve with respect to the solar day.
  • The years of life left in the operation, which define whether fixed or relocatable equipment is appropriate.

We calculate it with your logs and measurements, never with a generic percentage. Less fuel also means fewer emissions to report.

Current framework (Electrical Sector Law, 2025)

  • Isolated self-consumption is intended only for the site's own needs and does not require interconnection studies or registration in the electricity market.
  • With 0.7 MW or more of generation, a generation permit from the National Energy Commission (CNE) is required.
  • Machinery for renewable generation can be deducted 100% (art. 34, fr. XIII, LISR), with conditions. Validate your case with your tax advisor.

Frequently asked questions

How much fuel can be saved with a microgrid?
It depends on the irradiation of the site, the load profile, how much solar energy the system can absorb and the price of the fuel put on site. We do not give a percentage without data: we calculate it with an hour-by-hour simulation from your fuel logs and load measurements.
Do I have to replace my generators?
Normally not. Existing groups are integrated if their control supports parallel operation and communication with the PMS; if not, the control (governor, voltage regulator, or group controller) is updated. We work with DEIF, Woodward and Schneider Electric platforms.
What if the BESS or the control system fails?
The microgrid is designed with a degraded mode: if the BESS or EMS goes out of service, the generators continue to operate with their local control and load sharing between them. Fuel optimization is lost, not site energy.
Can the microgrid be relocated when the site operation is complete?
Yes, if designed for it. Generation, BESS and boards can be supplied in containers or patins, and the solar in fast-mount structures, to move to another work front or to another mining unit.
Does an isolated microgrid need permission from the CNE?
With 0.7 MW or more of generation, isolated self-consumption requires a generation permit from the CNE, although it does not require interconnection studies or registration in the electricity market. We review the procedure applicable to each project.

Is your plant connected to the network and looking to operate on the island in the face of faults? See industrial microgrids connected to the network.

How much does it cost you every liter of diesel put in place?

We review your fuel logs and load profile and tell you how much of your generation can be covered by solar and storage.

Request evaluation