Generation control in geothermal plant — Nayarit
Geothermal plant with obsolete controls from the 90s, risk of unscheduled shutdown in continuous operation for CFE.
Complete speed control system with Woodward 505, DSCL-II, Siemens S7 PLC, HMI and Bently Nevada 3500 vibration monitoring.
Stable synchronization with the CFE grid, new switchboards and a complete installation. Zero unplanned shutdowns in the first year.