Total control of your engines, from a single point.
VMS Energy designs, supplies and installs industrial CCMs: fixed, plug-in and Pilift types; forms 1 to 4b; DOL, soft-Sterger and VFD starters; Modbus, Profibus, EtherNet/IP and PROFINET communication. The applicable regulations are defined according to the specific requirements of each project.
A stationary engine costs more than the MCC that protects it.
In industrial facilities with dozens or hundreds of dispersed motors, the individual management of starters, protections and control wiring generates high maintenance costs, long diagnostic times and arc flash risks for personnel. When a critical process engine fails without coordinated protection, the impact is not limited to the equipment: it drags down entire production lines.
A well-specified industrial MCC according to IEC 61439 centralizes control, standardizes protections, facilitates secure access for maintenance and enables integration with the plant control system — transforming reactive fault management into predictive maintenance with real-time visibility.
VMS Energy has 18 years of experience in EPC electric projects in Mexico: Oil & Gas, power generation, manufacturing and mining. We design the MCC from detail engineering to commissioning and testing the FAT/SAT, with complete coordination of protections and NFPA 70E electric arc analysis.
Forms of separation IEC 61439-2
The form of separation defines the level of internal insulation between bars, functional units and terminals. Determines the safety during maintenance and the cost of the board.
No internal separation
Distribution bars, functional units and cable terminals in a common compartment. Any intervention requires cutting the general power supply to the MCC.
Use: auxiliary low criticality facilities, service pumps, general ventilation.Separate UF bars
The main bars are isolated from the functional units by barriers. Form 2a: no separation between adjacent FUs. Form 2b: with separation between each UF.
Usage: food and beverage industry, HVAC, water treatment plants.Cable terminals separated from bars
Adds separation between external terminals and bus bars. Form 3b also includes separation between adjacent functional units. The most specified in medium manufacturing.
Usage: automotive manufacturing, mining, industrial distribution substations.Total separation — maximum security
Bars, functional units and terminals in completely independent compartments. Form 4b: terminals in compartment separate from the UF — allows hot withdrawal (drawout).
Use: Oil & Gas, power generation, petrochemical plants — maintenance without production stoppage.Constructive types of MCC
Each construction type defines the extraction mechanism and the level of operational continuity that it can guarantee during maintenance.
Fixed type MCC
Functional units are wired directly to the cabinet. Removal of any module requires cutting power to the main bus or affected cubicle. It is the option with the lowest initial cost and greatest construction simplicity.
- Available forms: 1, 2a/2b, 3a/3b.
- Typical starters: DOL up to 75 kW, star-delta up to 200 kW.
- Maintenance requires stopping the process or using by-pass disconnectors.
- Suitable when the controlled motors are non-critical process or have redundancy.
- Integrated brands: ABB, Schneider Electric, Eaton.
| Parameter | Typical value |
|---|---|
| Rated voltage | 208 V to 15 kV (LV: 400/480 V) |
| Short circuit current (Icc) | up to 85 kA @ 480 V (with limiter) |
| Degree of protection | IP31 to IP54 depending on environment |
| Operating temperature | -5°C to +55°C (standard) |
| Maximum altitude without derating | 1,000 m.a.s.l. (IEC 61439) |
MCC plug-in type
The functional units are connected to the bus via plug-in contacts. They can be removed without special tools and without cutting the main bus — although the cubicle remains under tension during removal. Combines economy and maintenance flexibility.
- Forms available: 2b, 3a/3b, 4a.
- Typical starters: DOL, Y-Δ, soft-starter up to 630 kW, VFD up to 400 kW integrated.
- Module removal in seconds without cutting the bus — ideal for frequent startups of spare modules.
- Personnel must wear arc flash PPE (NFPA 70E Cal/cm² as per study) during extraction.
- Integrated brands: Siemens SIRIUS, ABB MNS, Schneider Prisma.
| Parameter | Typical value |
|---|---|
| Standard cubicle width | 600 mm, 800 mm or 1 000 mm |
| Functional unit height | 1U (50mm) to 12U (600mm) |
| Number of UF per column | up to 24 UF 1U in column of 2 000 mm |
| Ground bus | continuous throughout the entire structure |
| Communication protocol | Modbus RTU/TCP, EtherNet/IP, DeviceNet |
MCC drawout type (carriage removable)
Each functional unit is mounted on a removable cart with three operating positions: Connected (normal operation), Test (control circuit active, power off) and Offline (car outside the cubicle). Allows complete maintenance without disrupting the rest of the MCC.
- Form 4b only — maximum separation between bars, UF and terminals.
- Test position allows checking control logic without energizing the motor.
- Mechanical and electrical locks (interlock) prevent inserting the carriage in the wrong position.
- VFD Pistonout with integrated IEEE 519 (THDi < 5%) filter.
- Integrated brands: Siemens SIVACON S8, ABB MNS iS, Rockwell Allen-Bradley IEC.
| Position | Power | Control | Use |
|---|---|---|---|
| Connected | ✓ Active | ✓ Assets | Normal operation |
| Test | • Not connected | ✓ Assets | Logic verification, PLC, HMI |
| Offline | • Not connected | ✗ Offline | Major maintenance, replacement |
Motor starter selection
The choice of starter directly impacts the starting current, available torque, energy efficiency and the useful life of the electrical installation.
Direct to line boot
Applies nominal voltage to the motor in a single step. Maximum starting torque, maximum simplicity. The impact on the network is severe: the inrush current can reach 8×In and generate voltage drops that affect other equipment.
Star-delta
Starts in star (voltage reduced to 58%), then switches to delta at normal speed. Starting torque and current drop to 33% of DOL. Switching generates a transient that can exceed the DOL if load is present — requires load decoupling at startup.
Electronic soft starter
Electronic control of starting voltage using thyristors. Allows you to configure the acceleration ramp and the limit current. Ideal for centrifugal pumps, compressors and loads with mechanical impact. Includes built-in phase imbalance and overtemperature protections.
Variable frequency drive
Full control of motor speed, torque and frequency. Due to the affinity law (P∝n³), a 20% reduction in speed in pumps and fans reduces consumption by up to 49%. Controlled starting current ≤150% of In. It is the only solution when the process requires variable speed.
Industrial communication protocols
VMS Energy CCMs are integrated with the plant control system using leading industrial protocols. Selection depends on existing PLC/SCADA platform and determinism requirements.
The universal standard
Modbus RTU over RS-485 is the most widespread protocol in legacy industrial installations. Simple, robust and compatible with all PLCs and SCADA on the market. Modbus TCP moves the same data frame over Ethernet, eliminating the protocol gateway.
Determinism in Siemens plants
IEC 61158 standard for industrial field networks. Deterministic with cycles of up to 12 Mbps. Supports up to 126 nodes per segment. Native on Siemens S7-300/400/1500. Each MCC has a DP-Slave that reports status, current, defects and commands start/stop from the master PLC.
Rockwell/Allen-Bradley Ecosystem
CIP (Common Industrial Protocol) over standard TCP/IP. It allows sharing the same corporate and industrial network infrastructure. EtherNet/IP devices on the MCC are accessible from ControlLogix, CompactLogix, and Studio 5000 without additional gateway configuration.
High Speed Industrial Ethernet
Evolution of Profibus over standard Ethernet. With IRT (Isochronous Real Time) it achieves deterministic cycles of 1 ms — required for motion control and motor synchronization applications. Native integration with TIA Portal and SINAMICS G120/G150.
Reference regulatory framework
The rules presented below are of a nature information and represent the most common technical framework in industrial JCC projects. The regulations applicable to each project — including national standards, requirements of the client or competent authority — are determined and agreed at the basic engineering stage in accordance with the specific requirements of the scope contracted.
MCC EPC process with VMS Energy
From lifting to commissioning and FAT/SAT testing, VMS Energy manages the entire MCC cycle as a sole contractor.
Load lifting and scope definition
Complete inventory of motors (kW, voltage, service factor, duty cycle), environmental conditions of the electrical room (temperature, altitude, ATEX classified area), existing control platform and operational continuity requirements. Result: draft MCC technical specification.
Detail engineering: coordination of protections and Arc Flash
Calculation of symmetrical and asymmetric short circuit on each bus. Selection of MCCBs, contactors, thermal relays and motor protectors with Type 2 coordination (IEC 60947-4-1). NFPA 70E electric arc study: calculation of incident energy (cal/cm²) and determination of PPE category for each cubicle.
Factory FAT manufacturing and testing
Manufacturing of the MCC in a certified workshop. Factory acceptance tests (FAT) according to IEC 61439: point-to-point wiring verification, dielectric testing, insulation resistance measurement, verification of startup sequences with PLC simulator, and review of arc flash labels.
Installation, commissioning and commissioning
Mechanical assembly, power and control connection, parameter configuration of starters and drives, integration with the customer's communication protocol (Modbus, Profibus, EtherNet/IP, PROFINET) and communication verification with PLC/SCADA. Sequential start-up tests and process signal verification.
SAT tests and delivery of technical dossier
Site acceptance tests (SAT) with the client: verification of all control and protection functions under real operating conditions. Delivery of the complete technical dossier: final as-built drawings, preventive maintenance, recommended critical spare parts, FAT/SAT test reports and electric arc study.
Reference case
Two engine control centers for a CFE turbogas plant on the island of Cozumel.
CTG Chankanaab — AC and DC motor control centers
VMS Energy designed, muttered, supplied, installed and launched two engine control centers and low-voltage distribution boards for CTG Chankanaab, a CFE-based Turbogas plant on Cozumel Island, .
The site imposed high humidity, limited physical space and CFE's specific standards and requirements, with a very short supply period. The solution was two systems—a 480 VAC motor control center and another direct current—designed and manufactured to suit that environment, those weights and those dimensions.
- Client
- CFE — Chankanaab turbogas plant, Cozumel island
- Scope
- Engineering, manufacturing, supply, installation and commissioning
- Conditions
- High humidity, limited physical space and short delivery time
Why VMS Energy for your MCC
We don't just supply the panel — we manage the entire engineering, protection coordination, and integration with your control system.
Detail engineering included
Short circuit calculation, Type 2 protection coordination and NFPA 70E electric arc study. We don't buy a MCC off the shelf — we design it for your specific installation.
Multi-protocol and multi-brand
We integrate Modbus RTU/TCP, Profibus DP, EtherNet/IP and PROFINET. We work with ABB, Siemens, Schneider Electric, Eaton and Rockwell — without being tied to a single manufacturer.
18 years in heavy industry
Experience in Oil & Gas, power generation, mining, manufacturing and food and beverages. We know the operational and security requirements of each sector.
FAT / SAT and complete dossier
We deliver the complete technical file: factory and on-site tests, as-built drawings, arc analysis, list of critical spare parts and preventive maintenance plan.
National presence
Offices in Guadalajara and Ciudad del Carmen. Projects throughout Mexico: Jalisco, CDMX, Veracruz, Tabasco, Campeche, Sonora, Nuevo León and Coahuila.
Preventive and corrective maintenance
Long-term maintenance contracts: thermography, connection verification, relay calibration, VFD firmware update and 24/7 emergency service.
Industrial CCMs supplied and installed
BALAM-A Platform — Pemex
Campeche (offshore)
Supply and testing of a MCC and, in subsequent intervention, engineering adequacy, installation, interconnection, testing and operation of an arrangement in MCC-02.
BALAM-A and EK-A platforms — Pemex
Campeche (offshore)
Functional tests and commissioning of the protection of the MCC-1 starters.
Pemex
Campeche (offshore)
Manufacture, supply, pre-operational electrical testing, commissioning and performance testing of a removable mount MCC: 600 A main bus and 30 A branch bus at 480 V, UL, with Profibus communication and display screen of the status of the starter combinations.
Era Minerals
Jalisco
Design, supply, construction, installation and commissioning of a low voltage MCC type panel for the mining industry.
PIASA Group
Veracruz and Oaxaca
Medium voltage electrical engineering for the connection of substation to panels and MCC at the Tres Valles and Adolfo López Mateos sugar mills.
CFE—Central Chankanaab
Cozumel, Quintana Roo
Engineering, supply, installation and commissioning of motor control centers in alternating current and direct current.
Frequently asked questions
What is a MCC and what is it used for in an industrial installation?
A Engine Control Center (MCC) is a assembly of electrical boards that integrates into a single cabinet all the devices necessary to start, protect, control and monitor electric motors. It concentrates functional units (starters, variable frequency drives, savers, switches), distribution bars, control wiring and communication protocols. A MCC replaces the individual installation of each engine — reducing the space in the electric room, facilitating maintenance, improving the coordination of protections and allowing integration with SCADA or central PLC. The sectors that use it most are oil & gas (bombs and compressors), manufacturing (production lines), mining (mills and fans), industrial HVAC (chillers and towers) and plants of water treatment.
What is the difference between a fixed, plug-in MCC and a Pissout?
The fixed type MCC is the most economical: the functional units are wired directly to the cabinet and their removal requires cutting the entire power supply to the panel. The plug-in type allows the functional unit to be removed without special tools, automatically disconnecting the power contacts when removed, but the cubicle remains energized during removal. The drawout type (removable or cart) is the safest and most flexible: the unit is removed in three positions — connected, test and disconnected — without interrupting the power to the other cubicles, which allows hot maintenance. The drawout type complies with Form 4b according to IEC 61439-2 and is the standard for plants where production stoppage has a high cost (Oil & Gas, mining, power generation).
What do the forms of separation for the Form 1 to the Form 4b in IEC 61439 mean?
The separation forms according to IEC 61439-2 define the level of insulation between the internal parts of the MCC. Form 1: no internal separation between bars, functional units and terminals — opening any cubicle exposes all parts under voltage; Only suitable for installations with low security requirements. Form 2a/2b: distribution bars are separated from functional units by barriers; 2a without separation between adjacent FUs, 2b with separation between them. Form 3a/3b: adds separation between the external cable terminals and the bars, but not between terminals and UF (3a) or between them (3b). Form 4a/4b: total separation — bars, UF and terminals are in completely independent compartments; in 4a the terminals are in the same compartment as the UF, in 4b in separate compartments. For industries with Arc Flash and hot holding requirements, Form 4b is specified.
How do I select between a DOL, star-triangle, soft-starter and VFD starter?
Selection depends on motor power, type of load and process requirements. DOL (direct to line): starting current 6–8×In, torque 100% — used for small motors (≤7.5 kW) or where starting time is not critical and the network can withstand the impact. Star-delta (Y-Δ): reduces starting current to ≈33% of DOL (2–2.7×In) — for 15 to 75 kW motors with no-load or light load starting; Starting torque is also reduced to 33%, making it incompatible with high starting torque loads. Soft-starter: configurable current between 2 and 4×In with progressive acceleration — ideal for centrifugal pumps, compressors and loads with mechanical impact; Includes built-in phase imbalance and overtemperature protections. VFD (variable frequency drive): full control of speed, torque and frequency; starting current ≤150% of nominal; energy savings of 20–50% in pumps and fans due to the affinity law (P∝n³); It is the only option when the process requires variable speed.
What communication protocols do industrial VMS Energy CCMs support?
VMS Energy CCMs can integrate with major industrial protocols depending on the customer's automation platform: Modbus RTU (RS-485, up to 32 slaves, speed 9.6–115.2 kbps) for legacy systems and budget-tight environments; Modbus TCP over Ethernet for direct integration with SCADA without gateways; Profibus DP (up to 126 nodes, 12 Mbps, deterministic) for plants with Siemens S7-300/400 PLC; EtherNet/IP with CIP over TCP/IP for Rockwell/Allen-Bradley environments with ControlLogix or CompactLogix; and PROFINET (with IRT up to 1 ms deterministic cycle) for Siemens TIA Portal installations with zero latency tolerance. The selection of the protocol is defined in the detailed engineering together with the client, considering the existing SCADA platform, the number of nodes and the response time requirements.
What rules apply to the design and manufacture of an industrial JCC in Mexico?
In Mexico, industrial CCMs are governed by IEC 61439-1 (general requirements for low-voltage switchgear assemblies) and IEC 61439-2 (power assemblies), which define design and routine tests, forms of separation and temperature limits. The integrated starters and contactors follow IEC 60947-4-1 (AC motor starters). Overcurrent protections are coordinated in accordance with NOM-001-SEDE-2012 (electrical installations, article 430 for motors). For installations in the United States or export, UL 508A (industrial control panels) applies. Arc flash analysis follows NFPA 70E to determine personal protective equipment required during maintenance. VMS Energy delivers the complete technical file: calculation report, protection coordination, arc warning labels and FAT test certificate.
How do we start a MCC project with VMS Energy?
The process begins with the lifting of the project load: list of motors (power, voltage, service factor, duty cycle), environmental conditions of the electrical room (temperature, altitude, ATEX zone if applicable), existing control platform (PLC/SCADA and protocol) and operational continuity requirements. With this information, VMS Energy prepares the technical specification of the MCC, proposes the construction type and the IEC 61439 form of separation, designs the coordination of protections and presents the technical-economic proposal in 7–12 business days. Contact our engineering team to start your free evaluation.
How many engines do you need to control?
Share with us your engine list, control platform and site conditions. In 7–12 business days we present the technical specification of the MCC and the technical-economic proposal — free of charge.
Related solutions
- Automation and Control PLC, SCADA, instrumentation and industrial networks
- Electrical Reliability (UPS/BESS) Energy backup and storage for critical plants
- Electromechanical solutions Substations, transformers and medium voltage distribution
- Triol Frequency Variations Medium voltage VFD for oil & gas pumps and compressors
- Industrial HVAC Air conditioning of electrical rooms and process areas
- Technical blog Electrical engineering articles, EPC and success stories