Substation EPC · Projects from MXN $1,000,000

MV/HV Electrical Substations

Construction, Rehabilitation, and Major Maintenance

Complete EPC engineering for medium- and high-voltage substations: design, equipment supply, installation, acceptance testing, and energization. From 13.8 kV to 115 kV in Mexico.

13.8 kV – 115 kV EPC construction and rehabilitation VLF & primary electrical testing Industry · Oil&Gas · Utilities · Sugar mills IEC 62271 / NOM-001-SEDE
Service scope

Electrical substation services

We cover the complete life cycle: from conceptual engineering to periodic major maintenance.

EPC construction

Conceptual and detailed design, supply of transformers, breakers, switchgear, and bus, civil works, electromechanical installation, FAT/SAT testing, and turnkey energization.

Rehabilitation and expansion

Replacement of breakers, disconnect switches, and transformers. Operating capacity expansion. Upgrade of protection and control systems (SEL and ABB REF numerical relays).

Major maintenance

Preventive and corrective maintenance: primary electrical testing, VLF, thermographic inspection, breaker cleaning and adjustment, protective relay calibration, and protection coordination.

Electrical acceptance testing

TTR (turns ratio), winding resistance, dielectric strength, no-load and load losses, VLF on MV and HV cables, short-circuit impedance test.

Synchronizing switchgear and interlocks

Design and installation of synchronizing switchgear for cogeneration systems and power plants. Safety interlocks and mechanical and electrical interlocking for shared substations.

ALS / SF₆ circuit breakers

Supply, installation, and rehabilitation of SF₆ high-voltage breakers (ALS 5315, ALS 56-235) for CFE Transmission and industrial substations. SF₆ refilling and testing.

Reference projects

Substations we have built and maintained

Industrial substations, offshore platforms, sugar mills, and switchgear rehabilitation for CFE Transmission.

Grupo PIASA

San Luis Potosí and Veracruz, Mexico

Substation construction. Medium-voltage electrical engineering to connect the substation to switchgear and MCCs at the Tres Valles and Adolfo López Mateos sugar mills.

CFE Transmission

Jalisco, Mexico

Supply and installation of spare parts to rehabilitate the metal-clad switchgear tie sections with ALS 5315 and ALS 56-235 breakers.

Cement plant

Jalisco, Mexico

Major maintenance of a 69 kV substation.

Tres Valles sugar mill

Veracruz, Mexico

Supply and startup of materials to increase the operating capacity of 4,160 V substations no. 2 and no. 5, with electrical testing.

MALOOB-D and ZAAP-E platforms — Pemex

Campeche, Mexico (offshore)

Electrical testing and startup of substations comprising metal-clad distribution switchgear, 1,500 and 1,000 kVA transformers, and uninterruptible power systems.

BALAM platform — Cotemar

Campeche, Mexico (offshore)

Complete VLF electrical testing of the sectionalizer’s primary and secondary circuits, and diagnosis of the 1,500 kVA transformer.

Adolfo López Mateos sugar mill

Oaxaca, Mexico

Engineering, supply, and startup of the cogeneration synchronizing panel, with MSLC II and DECS 250 units in the control board.

Campeche Litoral-A — Pemex

Campeche, Mexico (offshore)

Supply, installation, and testing of the 800 A, 4,160 V metal-clad Siemens main breaker feeding a 1,500 kVA, 4,160/480 V cast-resin transformer.

Bottling plant

Colima, Mexico

Maintenance of a substation, four transformers, and low-voltage distribution switchgear, with thermography, megger testing of wiring, and breaker operation tests.

Methodology

EPC execution process

Engineering and design

Field survey, short-circuit study, protection coordination, single-line diagrams, calculation reports, and equipment specifications.

Equipment supply

Transformers, SF₆ or vacuum breakers, MV switchgear, bus, control and protection panels. FAT follow-up at the factory.

Construction and installation

Civil works (foundations, oil containment), electromechanical installation, control and instrumentation wiring, and grounding.

Testing and commissioning

SAT per NETA MTS: TTR, resistance, VLF, dielectric strength, relay calibration, functional testing, and operational handover to the client.

Electrical testing

Acceptance and diagnostic tests we perform

IEEE C57.12 / IEC 60076

TTR — Turns Ratio

Verifies the rated turns ratio and winding polarity on every tap of the DETC/OLTC.

NETA MTS / IEC 60076

Winding resistance

Detects loose joints, broken conductors, or thermal deterioration in windings. Measured with a Kelvin bridge or micro-ohmmeter.

IEEE 400.2 / IEC 60502

VLF — Very Low Frequency

0.1 Hz dielectric test on MV cables. Detects XLPE insulation deterioration without the destructive risk of DC testing.

IEC 60076-1 §11.5

Dielectric strength (hipot)

Voltage applied for 1 minute to verify the integrity of the main and phase-to-phase insulation.

ANSI/NETA MTS

Contact resistance

Measurement of main circuit resistance in breakers and disconnect switches to detect burnt or loose contacts.

IEC 62271 / ANSI C37

Opening/closing time

Verification of SF₆ and vacuum breaker operating times with a trip circuit analyzer.

Equipment supplied

Substation components we supply

VMS Energy works with leading manufacturers to supply every component of a complete LV/MV substation, from switchgear to protection instrumentation.

Component Voltage level Available brands Supply Installation
Medium-voltage switchgear MV (4.16–34.5 kV) Schneider, ABB, SIEMENS ✓ ✓
Circuit breakers LV and MV Schneider, ABB, SIEMENS, EATON, CHINT ✓ ✓
Protection, control, and metering (PCM) panels MT Schneider, ABB, SIEMENS ✓ ✓
LV/MV automatic transfer switchgear LV and MV Schneider, ABB, SIEMENS, CIME, TRACSA ✓ ✓
Isolation panels BT Schneider, ABB, SIEMENS ✓ ✓
Medium- and high-voltage terminations MV and HV HUBBELL, IUSA, 3M, Sigtronic ✓ ✓
Surge arresters MV and HV Hubbell ✓ ✓
Grounding resistors MT Bender ✓ ✓
Medium-voltage meters MT Schneider Electric ✓ ✓

✓ = service available  |  Other manufacturers available per client specification.

Standards framework

Standards we apply to substations

IEC 62271

High-voltage switchgear. General and specific requirements for MV/HV breakers, disconnect switches, and metal-enclosed switchgear.

IEC 60076

Power transformers. Complete series: general requirements, temperature rise, insulation, short circuit, and dry-type transformers.

NOM-001-SEDE

Electrical installations in Mexico. National reference for the design, installation, and operation of substations and service entrances.

NETA MTS

Maintenance Testing Specifications. Internationally accepted test procedures for acceptance and maintenance of medium- and high-voltage equipment.

IEEE C57.12

Standard for Transformers. Performance and test requirements for distribution and power transformers in North America.

CFE L0000-06

CFE specifications. Requirements for equipment supply and installation at CFE Transmission and Distribution facilities.

Frequently asked questions

Common questions about electrical substations

What does major substation maintenance include?
Major maintenance covers: primary electrical testing (TTR, winding resistance, dielectric strength), VLF testing of primary and secondary circuits, inspection and diagnosis of breakers and disconnect switches, adjustment and verification of protective relays, structure cleaning and painting, and a condition report with recommendations.
What is VLF testing in substations?
VLF (Very Low Frequency) is a dielectric test technique that applies AC voltage at a very low frequency (0.1 Hz) to MV cables and windings. It detects XLPE insulation deterioration without the destructive risk of traditional DC voltage. VMS Energy routinely applies it to primary and secondary circuits in industrial substations and offshore platforms.
Does VMS Energy build substations from scratch?
Yes. VMS Energy delivers complete EPC substation projects: conceptual and detailed engineering, equipment supply (transformers, SF₆ breakers, switchgear, bus), civil works, electromechanical installation, NETA acceptance testing, and commissioning. References include a substation built for PIASA in Veracruz and major maintenance of a 69 kV substation in Jalisco.
What voltage levels do you work with?
VMS Energy works with substations from medium voltage (4.16–34.5 kV) up to high voltage (115 kV). We have executed projects at 4,160 V, 6.6 kV, 13.8 kV, 23 kV, 34.5 kV, and 69 kV for industry, Oil & Gas, and sugar mills, as well as ALS breaker rehabilitation for CFE Transmission.

Count on substation experts!

From conceptual engineering to energization, with experience in Oil & Gas, industry, and utilities.