Coordinated shipping for industrial projects | Technical advice prior to purchase | VMShop by VMS Energy
High voltage line

High voltage cables for transmission and substations

HV solutions with detail engineering, normative compliance and operational continuity.

  • ✓Technical coordination by voltage level
  • ✓Testing, documentation and QA/QC
  • ✓Deliveries by work phases

Technical approach

  • Constructions in accordance with standards
  • Support in design and shopping
  • Logistics management and traceability

How we work

Technical support for HV projects, from Diagnosis to delivery.

1

Diagnosis

We raise operating and route conditions.

2

Specification

We define Construction, testing and QA/QC plan.

3

SUPPLY

Staged delivery with full traceability.

Manufacturer portfolio

We did not arrive with a single catalogue. We arrive with the correct specification for your project.

VMS Energy selects the optimal manufacturer according to the voltage level, sector, applicable standard, availability and timeline of your project. KEI Wires & Cables is our main strategic partner, but we work with the best manufacturers in the world when the project requires it.

KEI Wires & Cables

Exclusive representative for Mexico. MV/HV/EHV power, ESP cables for Oil & Gas, photovoltaics, instrumentation and control. First option for most industrial projects in Mexico.

Südkabel

Specialty in highly engineered EHV cables (German manufacturing). Ideal when the project requires European standards, VDE certifications or special constructions for extra high voltage transmission.

Helukabel

Solutions for control, testing and special applications: LSZH for confined spaces, EMC armored, high temperature (silicona), cables for food industry and robotics.

Condumex / Viakon

Domestic manufacturing under NMX-J. Low voltage and control with short delivery times. Ideal for projects with a required national component or emergencies in the field. NOM-001-SEDE compliance.

Integrated EPC

When VMS supplies the cable, you already know how it will be installed — because we are the ones who will install it.

Through VMShop you can request a cable quote directly — with or without an EPC project. If the supply is part of an EPC project that VMS engineers and builds, the cable is integrated into the MTO with milestone logistics and single responsibility. If you only need the material, we also support you with the same technical rigor.

  • Engineering: We specify the correct cable based on load, route, environment and regulations — not the cheapest cable in the catalog.
  • Coordinated MTO: The cable BOM is synchronized with the construction schedule, not the supplier's inventory.
  • Logistics by milestones: We deliver cable when the job needs it, in the correct quantity and with complete traceability per reel.
  • Sole responsibility: A single company responds by specification, supply, installation, testing and Aing.

If you only need uninstalled supplies, we can also support you — with the same technical and logistical rigors we apply to our EPC projects.

Target applications

  • Transmission links and substations
  • Interconnection of critical industrial plants
  • Reinforcement and expansion of HV networks

Value for your project

  • Selection of wiring and shielding by standard
  • Technical review and complete documentation
  • Supply programmed by construction milestones
Engineering Notes

Key criteria for high voltage

The final selection depends on voltage level, installation method, protection coordination and voltage drop limits of the project.

  • Ampacity and temperature: validate permissible current of the driver at 90 °C in normal operation and 250 °C short circuit. Apply correction factors by ambient temperature, grouping and installation method (duct, tray, buried).
  • Construction and shielding: For underground installation in aggressive soils, specify steel reinforcement and HDPE cover. For installation on a tray with risk of humidity, validate longitudinal anti-humidity barrier.
  • Applicable standard: Projects with connection to CFE must comply with LAPEM specifications. Private projects: IEC 60502 (MV) or IEC 60840 (HV). Verify if the project requires NMX-J or international standard.
  • Logistics coordination: On-demand HV cable requires 8 to 14 weeks of manufacturing. Include this time in the EPC schedule before committing to a commissioning date.
  • QA/QC in reception: All VMS supplies include a certificate of test per coil, traceability labeling and check of the personal data of the company before installation.
IEC 60502 IEC 60840 NMX-J LAPEM/CFE NOM-001-HEADQUARTERS

Terms like XLPE, EPR, U0/U, LAPEM or NMX-J? Cable technical glossary

Frequently asked questions

What information do I need to quote HV cable?

Voltage level (U0/U in kV), total length per section, type of installation (buried, tray, duct), required standard (IEC, NMX-J, CFE/LAPEM), ambient site temperature and required delivery schedule.

Can you coordinate deliveries by stage of construction?

Yes. We schedule milestone deliveries with coil traceability and complete documentation (test certificates, MTC, packaging). This is standard in all our EPC projects.

What's the difference between armored and armorless wire?

The armor (galvanized steel wires) mechanically protects against impacts and crushing. It is mandatory for directly buried installation and recommended in ducts with risk of mechanical damage. In an inner tray without mechanical risk, it is generally not necessary.

Can I use aluminum conductors instead of copper?

Yes. Aluminium reduces driver cost but requires larger sections for equal ampacity (approximately 1.5 times). The decision depends on the balance between cost, weight, available space in trays and customer requirements or project standard.

What documentation does VMS deliver with the supply?

Factory test certificate (type and individual per coil), cable data sheet, report of measured lengths, traceability labeling per batch and, if the project requires it, documentation for CFE/PEMEX.

Do they also install the cable or only supply it?

Both options are possible. VMS Energy is an EPC contractor — if the project requires it, we integrate supply, laying, splicing, terminations and testing under a single contract. If you only need supply, we also do it with the same technical rigor.

Projects where this cable was key

Real cases of integrated supply to the EPC scope. Technical and logistical data — without revealing confidential customer information.

MV substation in automotive plant — Jalisco

Supply of 3.2 km of XLPE 6/10 kV cable with 2-phase delivery aligned to the EPC installation schedule. Complete documentation for ISO customer audit.

34.5 kV network expansion — mining sector

Specification and supply of HV cable with armor for underground installation in terrain with high sulfate content. HDPE cover selection for chemical resistance.

Interconnection of cogeneration plant — Veracruz

Supply and laying of cable 23 kV for interconnection with CFE. LAPEM documentation included. Coordination of joints and terminations as part of EPC scope.